It took me and 4 other plumbers to fit a 35kw heat only boiler, 28 - 22 -15mm piping (huge runs) and drill the required holes from room to room and hang 19 rads, 5 days and it was a 12k job
 
8 days to do heating on a bungalow for 2 men - just done one in 2 days all copper drops. can be your apprentice
 