Search the forum,

Discuss Installing new central heating pipework, 10 rad system. in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Status
Not open for further replies.
Don't let your wife's see that post btw :)
No she jest went upstairs .....

Watching grand design tree is one architect messing about a huge project for a Japanese lafy
 
Why mate I am a good husband ! All I was saying is things get worst form day on if you/I allow it .
 
Status
Not open for further replies.

Reply to Installing new central heating pipework, 10 rad system. in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Similar plumbing topics

I just had a quote for a new boiler install as follows I dont undertand why a 15-60 boiler pump is needed and a 25-100 pump is needed as well I...
Replies
3
Views
566
Hi, We moved into a new property yesterday and are a little baffled by the heating/water tank situation. The previous owners unhelpfully left any...
Replies
3
Views
338
Hi, I have 3 port value for HW & CH. Loft extension added many years ago so they added a T to go upstairs, only 2 rads up but 11 downstairs...
Replies
0
Views
256
B
Context for issue: I'd like to start by saying I'd rather not read 100 "Hire a professional comments", I will do that when/if it comes to it, but...
Replies
0
Views
369
Butchy10
B
Context for issue: Last winter the temperature switch on my boiler shorted somehow, the boiler was then running WAY too hot and ended up...
Replies
6
Views
579
Creating content since 2001. Untold Media.

Newest Plumbing Threads

Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock