• Thread starter Kyle87
  • Start date
  • Replies 132
  • Views 2K

Discuss Sok it to me ********s!! in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Status
Not open for further replies.
4e9aju6y.jpg


Thought had already uploaded this one.
 
i dare anybody else to up a photo, go on your all quick on the keyboards.:yes:


Thats because most are keyboard warriors. Well done to anyone who has posted a picture for all to see and cast an eye over. Shame on those that have past judgement without
 
and the burn and missing plaster where there when I started, honest :)
 
never had an issue with them yet, so can't comment on their unreliability, as with all kit, it's normally installer error that is the issue.
 
Other than the udderly ridiculous condense trap and the jig at the bottom, they're no worse than a DuoTec.
 
condensate !!! trap, doesnt have any washer or cap that can leak, which is a bonus in my mind and the jig could be better, but I prefer to use robo kits where possible to avoid the need for a jig at all, or if needed use the jig case to run pipes up the rear if needed.
 
Not gonna work with gas capped? Bit of a basic fault? But a spirotec? Crossovers look tidy. Would have run hot round under flow parallel to gas and tied it in higher up and fitted a doc .
 
Photo0041.jpg I have upped this before. tis a solid fuel/gas boiler/thermal store combo. the laddomat valve and quencher are next to the wood burner. btw the flue is running up behind a stud frame and accessible.
 
Couldn't get boards up upstairs without dismantling a bedroom full of built in furniture. This was a bare bones budget install hence the main HE boiler. I'd normally fit the filter in the airing cupboard but no room to move in there.
 
Like the labels / valve tags. Nice job assume u lagged it afterwards
 
dont use a torpedo level if you want good straight pipework always level the clips then add pipe easist way under a boiler is strike a center line and measure of each side ,youll most times already have a centerline from hanging the jig just take it down to the level of the lowest clipthen strike two lines level where the clips are going and measure of same spacings as the boiler pipe centers
 
Not gonna work with gas capped? Bit of a basic fault? But a spirotec? Crossovers look tidy. Would have run hot round under flow parallel to gas and tied it in higher up and fitted a doc .

This is a redundant gas supply. A new gas meter is outside now. The customer wanted the spirotech, it wasn’t me.
 
True. But they only ask for this in the form of a radiator, not an ABV.
 
Status
Not open for further replies.

Reply to Sok it to me ********s!! in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Similar plumbing topics

Hi all, Missus has decided to upgrade the shower to one with a rainfall head, and so naturally it's another job added to the list for me I'm...
Replies
3
Views
694
Hi Guys, Been having a real saga and head scratching situation. I originally had 1 problem, and now 2. Original issue: Air being built up in...
Replies
17
Views
4K
Not sure if this is a success or a fail or just a rant but We do have heat and hot water now So all started the evening of Friday the 12th (Nov)...
Replies
4
Views
2K
I have run 22mm plastic to three showers and 22mm copper to the bath. Intention was to run 22 all the way to below the bath with last bit in 15 as...
Replies
3
Views
4K
Hi, some professional advice would be greatly appreciated, We are having an Unvented Cylinder installed into our 2 bedroom ground floor flat. I...
Replies
17
Views
9K
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock