hi there,
i have started my gas engineer course and so far really enjoying it, pipe bending and soldering are a little messy 😆but i got material to practice at home so hopfully neaten all that up. We have been asked to write a mission statement for tightness testing but the instructor hasnt really told us what to put in it, he showed us a quick one but it was over 6 pages long and we didnt get to look through it. Ive started writting one and so far on page 5 and he says ive not put enough in it😟 does anyone have a copy of a mission statement i could have a look at to see exactly what kind of things need to go in it and the layout? ive noticed there aint much online regarding this topic so dont really know where to look

thanks in advance i really apreciate any advice
 
Perhaps if you didn’t call it a mission statement? 😂😂😂 Usually called a method statement. 5 pages and not enough in it? Does he work for igem? Make sure you reference ige/up/1b for domestic. I don’t have a copy of one, but they’re in loads of gas books. Maybe you can draw from some of this? IGEM/UP/1B Edition 3 +A: 2012 - Tightness testing/direct purging of small Liquefied Petroleum Gas/Air, NG/ LPG installations - IGEM - https://www.igem.org.uk/technical-services/technical-gas-standards/utilisation/igem-up-1b-edition-3-a-2012-tightness-testing-direct-purging-of-small-liquefied-petroleum-gas-air-ng-lpg-installations/
 
Perhaps if you didn’t call it a mission statement? 😂😂😂 Usually called a method statement. 5 pages and not enough in it? Does he work for igem? Make sure you reference ige/up/1b for domestic. I don’t have a copy of one, but they’re in loads of gas books. Maybe you can draw from some of this? IGEM/UP/1B Edition 3 +A: 2012 - Tightness testing/direct purging of small Liquefied Petroleum Gas/Air, NG/ LPG installations - IGEM - https://www.igem.org.uk/technical-services/technical-gas-standards/utilisation/igem-up-1b-edition-3-a-2012-tightness-testing-direct-purging-of-small-liquefied-petroleum-gas-air-ng-lpg-installations/
Lmao yep bloody autocorrect on pc 🤦‍Going to have to change it to method statement now 😂didn’t even notice that
 

Reply to method statement in the Gas Engineers Forum area at PlumbersForums.net

Similar plumbing topics

    • Informative
Why am I not surprised? Britain’s gas network still using engines from 1960s RAF fighter jets Ageing aircraft turbines will cost millions to...
Replies
4
Views
687
J
Hi all, I am a plumber but I do not carry out works to boilers as the majority of my is bathrooms so I am not gas safe. I have completed a...
Replies
1
Views
527
Had conventional boiler and tanks removed last year and new combi fitted and just recently had it serviced but the guy who did it has given me a...
Replies
9
Views
810
S
Hi all, looking for some advice please. So I've got a 25 year old Ideal classic NF40 boiler. We live in a naturally warm house so only have the...
Replies
4
Views
1K
Hi there, thanks for your time to look at this record long post!! I work on the operational management side or a small building contracting firm...
Replies
9
Views
1K
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock