Hi, I would like to pick some of the experts brains on here if I may :wacko:

I have just moved into a 2 floor, 4 bedroom house with a hot water cylinder system (with central heating pump in line), fed by a coil from the boiler and immersion in reserve (Honeywell wall mounted device controls both water and heating separately with a further central heating stat located in the hall). The central heating system is made up of 5 medium sized (1 large) radiators downstairs and 6 small/mediums upstairs, mostly fed by 10mm pipes which look awful! The boiler is the original 1985? boiler which seems to work ok for now.

Looking into systems i think that an unvented system will be the way forward in the future - the mains appears strong (not measured yet but pretty certain it'll be good for the unvented), a combi just causes too much issue especially when I'm cleaning the car and she's showering! We also have a very low pressure mains fed stat shower in the en suite which is virtually unusable due to rubbish pressure (no pump), currently using the electric shower in the main bathroom which is likely to stay as a back up once the install is done eventually (currently paying for a wedding so can't really afford yet). The new cylinder would be fitted in the integrated garage meaning that i could use the airing cupboard to create a double shower in my en suite.

1) My main problem now is what to do about these 10mm pipes which are unsightly and frankly, I can't see how they can be as good as the 15mm - I've pulled apart the cloakroom to refit and thinking that whilst it's all apart, I might as well chase the 10mm to see where the 15mm starts and then speedfit it with new 15mm to the rad, channeling the pipes into the wall from the floor through a feeder box, then 2x 90 degree elbows behind the radiator (as the 15mm pipe will obviously be less flexible than 10mm) to the valves (assuming the rads are 15mm connections) - probably running copper from the elbows for the small amount of pipe that can be seen under the valves. Can anyone see an issue with this? I ask as i believe that new systems run through the first floor and drop to the ground floor rads and lift for the 1st floor rads... and didn't know if this was a lot more efficient.

2) As I'm used to a combi with a filling loop. Something i want to find before i start isolating radiators is how to drain down. From reading i assume i tie up the valve on the header tank and then continue to drain the rads via the normal method with the boiler turned off (pilot out) - or if working the hot water, run the hot taps to empty the cylinder...

3) The flange to the central heating pump appears to be leaking - So what is the best method of attack for addressing this leak, try cleaning the joint and tightening first? then drain down and clean or replace as necessary - it's the large bolt beneath the pump

4) Another small leak is on the lower joint of the cylinder which is white and crusty, should i do the same with this or remove it and clean up after isolating and draining the cylinder?

Any help on the above points is greatly appreciated (I'll try and post pics of the leaks too as assume it could mean a new cylinder depending on the joint) - I figure that whilst the rooms are coming apart then i can do subtle upgrades until the large upgrade happens. After the cloakroom I'll be hitting the living room which has 2 medium rads both with 10mm pipework, the room will also be plastered in the next 6 weeks so would look to do the same with that room too.

Thanks in advance

Tim
 
Last edited:
I think i understand what your saying so i'll try and help:

1. As you got an old system, it will need a good flushing out. That should be your 1st priority, i understand you want to alter your 10mm to 15mm which will help with flow. However you do realise that the plastic 15mm fittings are quite bulky and will be a pain to chase into the walls. Which is what i think you mean by channelling. You can buy 10mm plastic fittings and pipe which would be much easier to chase into the wall.

Rads come with a standard 1/2inch connection. so you can put either a 15mm trv and lockshield set on or you can have a 10mm set.

Typically you run a 22mm main flow and return through the house on the 1st floor and branch off in 15mm to rads up and down .


2. You should have 2 tanks in your loft, 1 small 1 big. Big tank feeds the cold water to the hot water cylinder. The small tank feed water around your radiators, cylinder coil and boiler. To drain down you need to isolate the water going into this small tank. Then when your ready to fill back up let the tank fill on its own and bleed your rads as normal. Although be careful for air locks.

3. whilst draining down i'd then look at this, either pick up a new set of pump valves or clean and re washer it.

4. The leak your describing sounds like the cold feed from the tank in the loft that goes into the bottom of your cylinder. It would be best to drain the tank and reseal or replace depending on the condition of the fitting.

If your planning on going unvented in the future, and your going to replace some of the pipework, then you might want to look into replacing the boiler for a system boiler. But this is something you'll be able to discus with your installer at the time.

Hopefully thats helped, if ive understood correctly!
 
That's brilliant, thanks Soulman - much appreciated.

1) I had come across the 10mm pipes being fed into the walls but assumed with the lower ID of speedfit 10mm pipe, then I'd be still with a less efficient system? My walls where these rads sit are 3 plasterboard thick so should be easy to pull channel with either I imagine... do you think I'd get any benefit at all by increasing to 15mm? I was thinking that they'd warm up quicker due to the increased flow...

I'll have to check to see how the pipework is configured as I pull the house apart... yet to lift a floor board :)

2)I'll give that a go tonight as it was bugging me knowing the water won't have been changed for some time - still to locate the drain valve but i haven't checked all the ground floor rads for this yet.

3)Are these valves readily available from the likes of screwfix? I ask as I have one very local to me and would prefer to walk in with the part in hand. My only other consideration is if there is a copper collar on the pipe join preventing me removing the nut, or will it be a different type of join?

4)I'll do the same for this as the above - I had read that it was important to release the cylinder drain first before releasing the hot taps, is this correct? Also i gather the method for cleaning the joints is to wire wool, emery paper them etc then reseal?

Regards the system boiler - the only reason I hadn't considered a change yet is that i only put it on for ten mins to warm the water up for the dishes, it then remains hot all day - obviously winter use will see it being used a lot more for the rads. The people we bought off say that their plumbers said to keep it as long as possible as it was easy to repair and find parts for cheaply - I'll get the model later to update the thread.

Apologies for the amateur questions - As said, I am used to the sealed simple combi system which seems so much easier to understand :)

Thanks

Tim
 
Last edited:
PS Haven't i already got a system boiler?

Edit : ignore me, I've just read the differences which it seems will give me my closed loop back and rid me of one tank in the loft :)

Are the costs of these high? fitted...
 
Last edited:
No probs,

1. you can upgrade to 15mm and it will give increased flow to the rads. I,ve ran all my rads in my house with a 22mm main flow and return, 15mm branches and 10mm into the rads. Mine heat up just fine, but mines a combi. Yours being open vented at the moment would be better with 15mm as this would help prevent the black sludge from blocking the pipes.

3. Yes you can get theres from screwfix Gate Pump Valve 22mm | Motorised Valves | NoLinkingToThis Not sure what you mean by copper collar. Photo would help.

4. you need to isolate the cold feed to the cylinder. Should be a gate valve on that pipe. Although if its not been used its probably seized. If thats the case you'll need to drain the bigger tank and replace the gate valve. Yes thats right, and if its a threaded joint you'll need to remove the old ptfe from the threads.

Remember you'll need to add inhibitor when you fill the system back up. But test it first with just cold water to check for leaks. To add the inhibitor just put it in the small tank when your filling up the system.

System boiler was just a thought, if there's nothing wrong with what you've got for now then keep it going. However when you have the unvented fitted you'll need to alter some controls depending on how your system has been designed. But like i say, you can cross that bridge when you come to it.
 
Brilliant - I'm shooting off home now to attempt. Will update later hopefully.

4) I do remember two gate valves above the cylinder, hopefully they'll still work.

Inhibitor - that's far easier than the last system! I had to buy all the niggly bits to get a bottle emptied into a rad directly :)

We may consider the system boiler as it looks a lot more efficient and will save a huge bill come unvented installation day...

I'll hopefully be back later with pics if my internet is finally back on (only moved in 2 weeks ago)

Fingers crossed :)
 
OK, update... I'm not 100% what the pipe is that's leaking at the bottom of the cylinder, and consequently not sure if it's the hot water system or the central heating.

Secondly none of my rads have a drain valve, the only drains I can find are on the cylinder and above the stopcock on the ground floor.

I'll try and post some pictures
 
If your 10mm tails run back to manifolds then you could be in for more pipework than you bargained for. Also as Soul man pointed out, you would spend considerable time and money chasing out and making good to fit 15mm tails. If you live in an energy efficient new build house with small rads there's no real need for 15mm tails. 10mm is pretty rubbish but at least less invasive and more efficient in a modern system.

Personally I would not bother with a system boiler. I prefer separate components because they will be cheaper to service/replace etc in the long run and if your not GSR you can't mess with a boiler so that blows self maintenance well out of the question. And expensive boiler specific parts etc. Would be great for your plumber but not for you lol
 
Thanks Jim... The original plan was to possibly use the existing boiler with the unvented cylinder. I've done lots of reading and found that the efficiency difference isn't necessarily night and day, enough to offset the cost of the new system boiler. What's your thoughts on this regards running costs?

I'll have to lift the boards to see what I have... That said if it is worth my while keeping the 10mm then that'll provide an easier install when wall chasing. I'll make a decision once I've seen under the boards.

Tried uploading some pictures but it won't let me post a URL or a JPEG from my phone. Will try again tomorrow

For ref the house was built in 1986
 
Last edited:
Efficiency is mostly down to your homes insulation and heat losses, also the type of system ie having appropriate controls for heating/hot water and using it efficiently. The last thing I'd consider important is 3% improved efficiency with a Worcester boiler over an ideal or a sealed system as opposed to vented. Although unvented systems are obviously now the desired standard.
 
Last edited:
Status
Not open for further replies.

Reply to Advice needed - 10mm system conversion? in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Similar plumbing topics

Hi thank you for letting me join this forum . We have an air to water heat pump but the bungalow is piped in micro bore 10mm pipe which doesn’t...
Replies
4
Views
364
Afternoon all, I have a customer with a heavily extended semi which now has 4 beds, 2 bathroom and 5 reception rooms. They have started working...
Replies
5
Views
548
  • Question
My daughter's place has a small water leak on a ground floor radiator valve. The radiator pipework is small diameter.i.e 8 or 10 mm. A plumber...
Replies
3
Views
406
Hi, I'm in my new build 2 years and the shower pump has died. I have an air to water unit downstairs is in the utility which I've been told is...
Replies
6
Views
258
Hi All I'm planning on replacing a couple of rads soon as they are far too small for the size of the room causing the room to take an age to heat...
Replies
5
Views
725
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock