What would you do if you put in a new 28mm supply in 1st fix and when you come back for the boiler you find the 'electrician' has done this....
 

Attachments

  • 20221206_155055.jpg
    20221206_155055.jpg
    261.9 KB · Views: 25
I agreed to do the boiler only and someone else was doing the other plumbing. They've let him down and now he's trying to get me to do it.
I'm not touching it!
Apart from anything else the place is a mess with building materials spread everywhere, all the work is being done cheaply.
Was tempted to put a price in but with half the pipes already run and no lights or heat I'm just going to pass.
I know I'd end up regretting it as any price I'd quote would mean they'd expect the world in return.
 
Sparky will be whingeing that the pipes in a cable zone.
The pipe was there in 22 before. This job was a dud from the start.
35kw Main boiler on site before I started with horizontal flue.
Would have got away with 22mm if he'd got a 30Kw, would have benefited from rear piping on a baxi and flue going through roof vertically.
This is a perfect example for why you get the engineer to spec the parts and materials as he's saved no money and lost on aesthetic and warranty.
It was a favour just for me to do the boiler!
 
My
The pipe was there in 22 before. This job was a dud from the start.
35kw Main boiler on site before I started with horizontal flue.
Would have got away with 22mm if he'd got a 30Kw, would have benefited from rear piping on a baxi and flue going through roof vertically.
This is a perfect example for why you get the engineer to spec the parts and materials as he's saved no money and lost on aesthetic and warranty.
It was a favour just for me to do the boiler!
My first thought was get the cutters out.

Once spent a day drilling joists for a first fix. Heating flow and return, hot water, cold water, balanced cold water and unvented discharge. Was a big job. I was away 3 days after that and came back to cables in my holes.
Sparky came back next day to 400mm lengths of cable all over the floor.
 

Reply to What do you do when... in the Gas Engineers Forum area at PlumbersForums.net

Newest Plumbing Threads

Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock