Lost how mate? A new boiler and unvented cylinder with the boiler wired to a external weather sensor , I've recommended a water softener above . Kop
SO, at present im on a y plan, am i right in thinking, with an unvented a cylinder, it would be best to change over to an s plan, with the two valves close to the boiler? And if so, do i require an extra 5 or 6 core wire to link up new valves,??
If the y plan stays, i assume the new valve just goes near the cylinder somewhere and gets wired to the control centre....

Just want to try and do half a job! But do it right once!
New boiler is a bit costly at present...
 
SO, at present im on a y plan, am i right in thinking, with an unvented a cylinder, it would be best to change over to an s plan, with the two valves close to the boiler?
Weather compensation, if that's what you are still considering (I've lost track), is incompatible with standard S-plan with a cylinder as one zone because most of the time the CH water is below the 65°C minimum needed to heat the cylinder.
 
Various ways to do it but here's the Ideal wiring diagram for their heat only boiler and unvented cylinder with a outdoor sensor installed .Kop
 

Attachments

  • Screenshot_20230303-195634.png
    Screenshot_20230303-195634.png
    303.9 KB · Views: 8
  • Screenshot_20230303-194928.png
    Screenshot_20230303-194928.png
    90.5 KB · Views: 8
SO, at present im on a y plan, am i right in thinking, with an unvented a cylinder, it would be best to change over to an s plan, with the two valves close to the boiler? And if so, do i require an extra 5 or 6 core wire to link up new valves,??
If the y plan stays, i assume the new valve just goes near the cylinder somewhere and gets wired to the control centre....

Just want to try and do half a job! But do it right once!
New boiler is a bit costly at present...
5 core and basically yes I'd change the 3 port to two or even 3 - 2 ports zone valves does your property need to be as warm upstairs as it does downstairs?
 
Bungalow....
Big bungalow? Still applies bedrooms and living areas can be split up all these little things add up to more control over your heating and savings on energy, the one big thing to remember is insulation 350 mm in your loft space is now the norm walls , floors I'd do the lot if I could in reality you probably can't 🙂 but just do what you can.
 
Big bungalow? Still applies bedrooms and living areas can be split up all these little things add up to more control over your heating and savings on energy, the one big thing to remember is insulation 350 mm in your loft space is now the norm walls , floors I'd do the lot if I could in reality you probably can't 🙂 but just do what you can.
4 bed, yeah, i suppose its big by todays standards, 80s...so insultaion is poor at least...on a hill to, so we catch the easterly blows!
 
As KoP suggested the best thing you can do to improve efficiency and comfort is to improve insulation - it really can't be overstated!
Weather comp is underrated too I think and is definitely possible with s-plan type setup. You could search for X-plan as an option, it does start to get a bit technical but well worth a try.
 
I just re-read this. I first read it as no more than 7 minutes at a time. Apologies, how long are you in there? 7 minutes is a long shower in my book. If it's going to be over 10-12 min each one after another, go bigger.
No idea! Ive never timed it tbh!!
I have more on my plate than thinking about shower times at present....selfish but true....shower time is my escape, my down time
 
Tbh i'd go off local recommendations from people who have actually used someone.
Agreed. Alternatively, if that doesn't work, try the cylinder manufacturer's website. They'll usually list several 'approved installers' for your area. They'll have done the manufacturer's product-specific training and you may get a longer warranty if you use them.
 
Is that INC VAT and you supplying all the materials and sourcing them? Or they sorting materials too.
Thats purely the labour content.inc vat. I have the cylinder, they say to supply pipe and fittings. Plus 1 zone valve.
Change y to s plan.
Move mag filter, as apparently its only on heating return and doing nowt for the boiler.
Raise f+e tank in loft.
Fit cylinder in loft on platform ive built.
Pipework to be run up new airing cupboard wall. Its a blank canvas in my book...

Am i so out of touch with life in 23!!?
 
I would say 3 days with lagging and the discharge pipework that runs externally u less you have a soil vent up there
 
Also I would recommended sealing the system as the cylinder is in the loft high chance of pumping over
 
3 days for 1 man?
NO, no soil vent, but there are easy options for discharge i would think...

Yes or 4 if it’s a pain discharge has to be copper or high temp plastic and if over x m it has to be 28mm it can’t be overflow tube
 
I would as your having the cylinder in the loft better heat up times customers report and not open to atmosphere so better water quality if flushed
 
Why high chance of what pumping over??

You haven’t much head from the top of the cylinder coil and bottom of the f and e tank at present you have around 2.4m ish with a cylinder in the loft maybe 1-1.5 m max
 
Yes you want a min of 2m above the coil of the cylinder to the bottom of the f and e tank
 

Reply to Unvented cylinder size in the UK Plumbing Forum | Plumbing Advice area at PlumbersForums.net

Similar plumbing topics

Fitted unvented hotwater cylinder building control looking forms signed it off job was in england i am qualified northern ireland send out a form to fill in what do u need to sign off in england as building control said they dont give out forms like they do in northern ireland
Replies
4
Views
198
Copper pipes, I think its fair to say, is not what it used to be, the copper is getting thin while the cost is going up. Meanwhile, plastic Pushfit seems to be getting better and better, cost and convenience was always better, but now the quality is to, have we reached a stage where plastic will...
Replies
2
Views
249
Hi all. Hope you have all been keeping well. A while back I decided I only wanted to fit one brand of boiler and decided on Viessmann due to space for servicing and changing parts if ever needing to. I am finding my decision rather hard due to the different clearances on flue runs and cupboards...
Replies
9
Views
204
Hello plumbers in my internet. So the Mrs want a spray mixer tap in the kitchen as we had two separate taps. I changed the tap for a temporary two hole mixer but the cold water pressure is high mains fed and the hot is low pressure immersion tank fed. I've been trying to find info on what I...
Replies
2
Views
124
I was stupid enough not to check the position of the pipes under the tiles when installing a toilet and drilled right through the center of a 16 mm copper water pipe. I exposed the pipe by removing a ~30cm section of the plastic sleeve and a ~10 cm section of the pipe around the hole. Several...
Replies
0
Views
187
Creating content since 2001. Untold Media.

Newest Plumbing Threads

Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock