Discuss Unvented cylinder in loft - terminating tundish in the USA area at PlumbersForums.net
Yes, the fall on the D2 must be a minimum 1:200Ill need to check with client for load bearing walls to reposition it, a shorter run in copper does seem a better and neater option.
[automerge]1581964112[/automerge]
I've just found a figure for the fall required (1:200), is that right?
Boss copper into the stack?
With a hot tun or Tesla tun at the cylinder?
Reply to Unvented cylinder in loft - terminating tundish in the USA area at PlumbersForums.net