hi all

just looked at a job where they want a new cold mains supply run outside and they want the sparky to fit trace heating to the mains supply as the old supply had burst (no lagging) :rolleyes:

what im thinking of doing is running the new supply in 22 hep twin wall with lagging (19mm wall) then the sparky can fit his trace heating to the hep, question is is that ok? i know hep can take temps up to about 90c so in my mind it should be ok.

please feel free to say if its ok or not just need to run it pas someone else lol ;)
 
I would go with GQ - alcatheyne is much more robust - and the fittings are better for underground
i think

centralheatking
 
It depend on the wattage of the trace heating .. som types can get quite high surface temperatures and if in contact directly with plastic pipe then could cause problems .. need to discuss carefully with the sparky ..
 
Read through previous posts about Hep pipe. It has proved to be a poor performer in frost which is why I no longer use it. MDPE is the best for your job.
 
so if i put alcatheyne in with 19mm wall lagging would i need the sparks to even bother putting the heat trace in or not?

i was thinking hep as i know it can have warm water in it and as i do not know what temp the heat trace runs at i dont want the alcatheyne to melt or somthing

its not going under ground its going high lvl in a cable tray out side
 
yes but it is outside so alcatheyne is stronger than hep much thicker material. Best checking with the specs and see what its heat tolerance is, I'm sure It'll cope the heat tracer only kicks in at 4 degrees celsius to prevent freezing and it would probably only heat up a few degrees i believe, again best checking with sparky.

all in all I think alcatheyne is the best choice
 
looks like alcatheyne then

any one know what the hottest temp it can take befor melting?

i will get a price on it all tomorrow and go from there.

thanks for the info lads
 
Last edited by a moderator:
you may wish to check water regs , theres a reason pipework is underground at a depth of 750 to 12350mm, it wont freeze, common
sense really.
 
Status
Not open for further replies.

Reply to new 22mm hep cold mains supply in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Similar plumbing topics

Hello all, I'm would like to extend an existing outside tap to another point in the garden. I'm about to pour a concrete patio and was hoping to...
Replies
6
Views
293
Hi all I'm hoping someone can shine a light on this for me Since our stop tap on the pavement has now been filled with sand for whatever reason...
Replies
3
Views
344
Hello all, I’m replacing a concrete paving slab patio in the back yard. The original patio used 50mm deep concrete slabs on hardcore & sand. I’m...
Replies
6
Views
327
Back
Top