Discuss how to level wall in shower before tiling in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Status
Not open for further replies.
N

nhenderson

hi, i hope someone can help. i have an existing recessed shower area where we have taken down tiles etc and fitted new shower traty. however one wall (on the right as looking at pic) is totally uneven. i started levelling with bonding but then read that its not a good idea if going to tile after. i cant board as its too uneven and the walls (crumbly breeze block) wont hold screws well. am i ok to fit a bead at front edge (thinking of using one of those rendering larger ones) and levelling off with wickes one coat patching plaster. then leave for couple of weeks before tiling? also do i fit beading with the plaster or use plsater adhesive?
ive plastered a few times before so comfortable doing it but just want to know its the correct thing. also the gap i am filling out is about 20mm and the tiles are the ceramic 60x 30 ones)

any help much appreciatedx and ave added (pic here hi,

any help much appreciatedx and ave added pic here - www.flyingkiwi.com/contact-form/img/IMG00007-20120828-1651 (1).jpg
thaz
thanks
neil
 
More easily answered on the tilers forum, but I would be dot and dabbing a board to the wall or fixing some hardibacker or aquapanel to the wall and then tiling on top of that.

Oh and welcome to the forum Neil. :)
 
thanks for that - i thought of dot dabbing but the gaps are hgue
 
i would do as simon says and over board with hardibacker then you wont have to wait two weeks to tile
 
thanks guys - in no rush though and afraid walll is too faar out for board?
 
Not clear from pic but can that breeze block wall be replaced with studwork? If so do it.
 
thanks phil = unfortunately not as some fittings on other side
 
Like the other guys have said dot and dab just put plenty on if your unsure
 
Seen your thread over on our sister tilers forum.

If those blocks are soft and fixings will not take, then you cannot overboard with hardibacker etc , as you have to mechanical fix as well.

Chop all the plaster back to the blocks and then dot/ dab PB and then tank to waterproof. Tank all walls that will be subject to wetting.
 
Whatever you do, don't use plasterboard anywhere. Use aquapanel or hardibacker

When I encounter that situation I use shower panel instead of tiling as you don't need to spend ages on preparation.
 
Status
Not open for further replies.

Reply to how to level wall in shower before tiling in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Similar plumbing topics

plumber has not fitted water supply pipes level to tiles in shower, one side is approx 5-7 mm out of line, can i fit some sort of extension to...
Replies
4
Views
409
My plumber fitted a shower, 2 of the walls are glass panels and one is a tile board (wedi board). He joint the wedi board pieces (3 pieces) close...
Replies
1
Views
493
S
Hi, hope all is well! I’ve fitted a compression cap on two of my shower mixer copper pipes (15mm). One of them has scratches and burring and is...
Replies
1
Views
415
Hello there, Relatively recently we had a new en-suite fitted (complete rip out of the old fittings, and old wall tiles and floor carpet). This...
Replies
6
Views
874
Good morning! First post looking for advice on an issue I am having with a bath installation. Although I have installed many baths before, mainly...
Replies
4
Views
577
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock