Just had an email from a customer, wanting a quote.
How long would it take to fit 21 trvs, 21 locksheilds and 21 vents? The customer wants to buy all the parts. Would you do the job?
Thanks
 
I would think of my price and phone them with it to see the reaction, if it was a good one I would then go see it, if they want it for pennies I would decline. I find this type of job people expect it done for washers.
 
i used to say £40.00 a rad that included the valve (drayton valves)
i never understand the need for customer to buy all the bits and think they are saving money.
21 rads is a big system so drain down and fill could take a while especially if open vented
 
i used to say £40.00 a rad that included the valve (drayton valves)
i never understand the need for customer to buy all the bits and think they are saving money.
21 rads is a big system so drain down and fill could take a while especially if open vented
They want to buy all their own stuff. :(
 
They want to buy all their own stuff. :(

I personally wouldn't do it labour only.

They will only mither you if anything goes wrong after the job is done and you don't make any profit over and above wages. I would tell them you only supply and install your own materials so the warranty is carried fully by you.

The time depends on the job. If they're similar valves (I always change the nuts, olives and tails too) I would reckon about 1/2 hour per rad, once you've got going? you've seen it though.

If it needs draining off first add a couple of hours to empty it and fill it. So having said that, it sounds like at least a day and a half (12 hours) perhaps a bit more. That's if there are no issues such as:-
  • The existing rad valves have internal nuts and a longer body so the pipes aren't quite long enough
  • The olives have been crushed by the Gorilla who went before you.
  • The system suffers air locks through poor installation and you're there a lot longer than expected
  • The system is filthy and needs a flush/clean.
Give them a written (emailed) estimate for the work. Not a quote!

That's my advice, hope it helps.
 

Reply to How long would it take to fit 21 TRV's? in the USA area at PlumbersForums.net

Similar plumbing topics

Would like some help please as my Drayton Wiser system is a mess. I had 2 TRVs in the lounge, one in the main bedroom, the rest of the house - 6...
Replies
3
Views
456
I have a home with an oil boiler in a garage turned into a flat, heating both flat and main house, running c plan with two pumps, two motorised...
Replies
0
Views
410
Good morning all, Just a quick one, ive recently been asked to fit a new fire in a property, there was one in previously but was removed simply...
Replies
3
Views
256
Hello everyone. New to the forum and looking for assistance / advice. I live in a rented house with a not very co-operative landlord. I have just...
Replies
3
Views
210
  • Solved
Hi There, I want to swap out my old valves for TRVs but the threads are different sizes, and I'm unsure how to resolve it. My current existing...
Replies
9
Views
2K
Daley power
D
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock