Most just guess.
Say 70kw,8 hours a day for 50% of the year. 101,920kw
Then hot water the rest of the year call it 1/5of the winter consumption. About 20,000kw
Total 121,920kw.

Or just ask for a u16 :D

Hope there's no fires or cookers:rolleyes:
 
Be careful with your gas runs, as your probably going to go way over your allowed purging volume.
 
Thanks!
Probably go electric with cooking and solid fuel on the fires.
As I said can get away with total 65 kw and done pipe sizing and gone overboard and it works out 35mm.
 
Thanks!
Probably go electric with cooking and solid fuel on the fires.
As I said can get away with total 65 kw and done pipe sizing and gone overboard and it works out 35mm.

What's your purge volume?
 
N Grid need to know what pipe they need to run, when you say 90-95kw what looks like you will get U16 and 63mdpe from NG What will be OK for client if any future upgrade. What and how you connect it's for later up to you.
Had couple upgrades last year and both time 63mm as next down is only32.
NG it's more happy this days when meter positioned externally for new runs,inside OK too but more difficult they can be
 
Have you misunderstood the original question?

Nope just wanted to know what you worked out as it sounds like you have pipesized it already
 
Nope just wanted to know what you worked out as it sounds like you have pipesized it already
We are still working out our max boiler sizes
Reckon we are gonna get total nearer 60 kw now.
Customer is thinking of dropping the gas cooker now
Just need to get the supply on going
 
Update
SGN are putting in two new supplies, one for the house and one for the annexe.
Our total load was 63 KW and they were concerned an E6 was not going to cope if everything was at max!
So between them and the customer 2 supplies were agreed.
Our purge volume was close to the domestic limit so this helps all concerned!
Thanks for all your input!
 
It will be a U16 meter . Whether a new service is required will depend on whats already in.
 
Status
Not open for further replies.

Reply to Gas consumption for new supply in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Similar plumbing topics

Hi there, thanks for your time to look at this record long post!! I work on the operational management side or a small building contracting firm...
Replies
9
Views
1K
H
Hi there, thanks for your time to look at this record long post!! I work on the operational management side or a small building contracting firm...
Replies
0
Views
656
HRP123
H
Hi all, Does anyone have any feedback as to which is best. Running the pipe from the outdoor gas meter to a new boiler on an outside wall or run...
Replies
15
Views
1K
We run a community village hall and have a large kitchen provided for the use of hirers. This includes a Lincat SLR9 gas cooker which I believe is...
Replies
5
Views
560
E
I reckon if I did a survey of 100 heating engineers, asking what would they recommend for heating a granny annexe being built onto the side of my...
Replies
0
Views
258
eco-heating options
E
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock