H
Heat Kent
This is a cylinder I did about a month ago – But are D1 & D2 acceptable? I got thinking about it after reading another post last night, so I did a little research. Does the minimum of 300mm before a bend apply to D1 as well as D2? I also have 2 elbows in D1, so what length of pipe does an elbow account for?
To put it right would I just need to just cut D2 under the clip and solder it back on under the tundish with a coupling or do I need to cut it up by the temp valve and extend the pipe work to the first elbow too?
I just want to say thank you to everyone on the forum for being so helpful, I’m learning loads of new things and building up a useful folder of specific regulations.
One in my folder http://www.stockport.gov.uk/2013/2994/developmentcontrol/14406/45614/019sanitation
To put it right would I just need to just cut D2 under the clip and solder it back on under the tundish with a coupling or do I need to cut it up by the temp valve and extend the pipe work to the first elbow too?
I just want to say thank you to everyone on the forum for being so helpful, I’m learning loads of new things and building up a useful folder of specific regulations.
One in my folder http://www.stockport.gov.uk/2013/2994/developmentcontrol/14406/45614/019sanitation