Currently reading:
What length of jobs do you prefer?

Discuss What length of jobs do you prefer? in the Plumbing Jobs | The Job-board area at PlumbersForums.net

longer jobs dont have to keep getting the kit in and out of the van :D
 
Small jobs of 1 or 2 hours I prefer.
Less pressure on me and I can still manage to fit in some breakdowns or other urgent call outs.
 
Too many very small jobs and I find myself squeezing too many in and running round a bit, too long a job and I get tunnel visioned and don't take breaks properly and it leaves me to knackered. So my ideal jobs are 2-3 hours long. Two of those a day at a chilled pace is what I'd prefer.
 
Too many very small jobs and I find myself squeezing too many in and running round a bit, too long a job and I get tunnel visioned and don't take breaks properly and it leaves me to knackered. So my ideal jobs are 2-3 hours long. Two of those a day at a chilled pace is what I'd prefer.
 
A good mix wouldn’t be bad. It’s nice to see the end after a long job it gives a good feeling once you finished it off. Smaller jobs can be profitable but it also can get really upsetting when things do t work.
 

Reply to What length of jobs do you prefer? in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock