Discuss pressure test full ch system y plan in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Status
Not open for further replies.

SafeGasInstall

Esteemed
Plumber
Gas Engineer
Subscribed
Messages
8,588
how many of you have ever done the air pressure test to a full ch system ?

me - never
 
Last edited:
only time i have ever pressure tested pipework is on commercial new builds, in domestic its pretty much water tested to 2 bar, leave to stand for 20-30 mins then heat tested
 
ive air tested lots of stuff bepending on situations try to air test anything that will be impossible to access later under screed behind casings etc also depends whats below 3mil flats can contain a lot of exspensive stuff and their owners are well versed in the insurance claim game the smallest drip will be right on top of their favorite rembrant
 
Status
Not open for further replies.

Reply to pressure test full ch system y plan in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Newest Plumbing Threads

Back
Top