Hey, has anyone worked on trace and access for insurance firms? May have an opportunity/job offer the work in this. I currently work on new build installs.
 
I am expecting it to be totally different to what I do now. I just wondered how other people rate trace and access work?
 
Status
Not open for further replies.

Reply to Working for insurance trace and acccess in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Similar plumbing topics

Prompted by a surveyors energy efficiency report (and getting grants as this job belongs to a small charity) I've been asked to lag the pipes in this boiler cupboard. So questions: 1.Anybody got a photo of a good professional job please. 2. Where to stop the insulation under the boiler...
Replies
3
Views
177
C
Hello, I'm wondering if you can help me. I have an insurance company who is trying to get me to make my plumber re-quote for work to replace a broken bath. He's included a bath panel with the quote as it's the type of bath that requires a panel (and the original style is not available so can't...
Replies
2
Views
396
    • Like
  • Locked
Hi all, Currently undergoing my level 2, hoping to get finished in the next few weeks. Looking to gain some experience, if anyone needs a mate etc. Im currently in the forces will be leaving in May however at the minute I can work Mondays/Fridays and weekends. Do not want paying just happy...
Replies
0
Views
229
Size of bathroom 230cm x 210cm Height 230cm Birmingham Area Initial problem Burst pipe underground in bathroom, concrete. Have had this dug up & made safe for now, have had affected pipe cut & put end caps on. Work required Full bathroom remove old tiles walls and floor. Renew tiling. New...
Replies
0
Views
316
I will need: install new 100mm pvc pipe work, 90-degree bend for new W/C install new 100mm pvc pipe work, 90-degree bend with new gully pot at rear of new extension for sink waste clean water pipe carry out 2 x Lead connections with a new T section No excavation needed, all is digged out.
Replies
0
Views
290
Creating content since 2001. Untold Media.

Newest Plumbing Threads

Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock