Discuss What we all working on this week ? in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Grouting up today before fitting the bath tomorrow , a shower door to swap over pm today . Kop
 

Attachments

  • IMG_20230228_122835209_MFNR.jpg
    IMG_20230228_122835209_MFNR.jpg
    294.5 KB · Views: 24
  • IMG_20230228_122848060_MFNR.jpg
    IMG_20230228_122848060_MFNR.jpg
    296.2 KB · Views: 20
Getting there on this one but over commited so means not there today I am fitting a Home boost pump and Saturday is now another work day fitting a brushed brass fancy shower door that's taken 6 week to arrive 😕 kop
 

Attachments

  • IMG_20230302_122516597_MFNR.jpg
    IMG_20230302_122516597_MFNR.jpg
    218.3 KB · Views: 12
  • IMG_20230302_122508016_MFNR.jpg
    IMG_20230302_122508016_MFNR.jpg
    270.3 KB · Views: 13
  • Screenshot_20230303-060152.png
    Screenshot_20230303-060152.png
    350.2 KB · Views: 15
  • Screenshot_20230303-060215.png
    Screenshot_20230303-060215.png
    394.4 KB · Views: 17
Finally done this one took 6 weeks for shower doors to arrive have a restful weekend chaps .
👍😉 Kop
 

Attachments

  • IMG_20230304_152937671_MFNR.jpg
    IMG_20230304_152937671_MFNR.jpg
    303.3 KB · Views: 14
  • IMG_20230304_160420521_MFNR.jpg
    IMG_20230304_160420521_MFNR.jpg
    272.8 KB · Views: 11
  • IMG_20230304_152951849_MFNR.jpg
    IMG_20230304_152951849_MFNR.jpg
    287 KB · Views: 9
  • IMG_20230304_160427680_MFNR.jpg
    IMG_20230304_160427680_MFNR.jpg
    273.9 KB · Views: 10
Cracking on with this one this week my work load is off the scale are you all insanely busy ? the phone hasn't stopped I'm leaving it now on answer phone and deal with it at the end of the working day . 😉👍 Kop
 

Attachments

  • IMG_20230307_162601771_MFNR.jpg
    IMG_20230307_162601771_MFNR.jpg
    186.9 KB · Views: 11
  • IMG_20230307_162552003_MFNR.jpg
    IMG_20230307_162552003_MFNR.jpg
    256.3 KB · Views: 16
  • IMG_20230307_162443114_MFNR.jpg
    IMG_20230307_162443114_MFNR.jpg
    325.8 KB · Views: 15
  • IMG_20230307_173118232_MFNR.jpg
    IMG_20230307_173118232_MFNR.jpg
    284.6 KB · Views: 16
  • IMG_20230306_161725864_MFNR.jpg
    IMG_20230306_161725864_MFNR.jpg
    184.8 KB · Views: 17
All change for toilet cistern boxing in 🙁 which is a pita messed my tiling up sure I can work something out but annoying, I didn't have the cistern till Tuesday the flush pipe is not cut able so needed to get creative 😉👍. Kop
 

Attachments

  • IMG_20230308_153119371_MFNR.jpg
    IMG_20230308_153119371_MFNR.jpg
    225.8 KB · Views: 15
  • IMG_20230308_135840192_MFNR.jpg
    IMG_20230308_135840192_MFNR.jpg
    275.1 KB · Views: 15

Reply to What we all working on this week ? in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Similar plumbing topics

Hi guys....we have an old Astracast sink top....I think its a composite sink....has a big single bowl. My wife thinks it looks scruffy....looks...
Replies
2
Views
224
Hi, Can anyone advise as to why the cold water to my bathroom keeps airlocking? This originally happened about 12 months ago and has happened 3-4...
Replies
9
Views
441
Hello plumbers in my internet. So the Mrs want a spray mixer tap in the kitchen as we had two separate taps. I changed the tap for a temporary two...
Replies
2
Views
218
We run a community village hall and have a large kitchen provided for the use of hirers. This includes a Lincat SLR9 gas cooker which I believe is...
Replies
5
Views
553

Newest Plumbing Threads

Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock