Discuss What we all working on this week ? in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Last one yesterday. Closing ceremony. Really good night.
 

Attachments

  • 57A05E77-2CF6-4869-8CD1-200FB73F9940.jpeg
    57A05E77-2CF6-4869-8CD1-200FB73F9940.jpeg
    663.6 KB · Views: 89
Final push on this bathroom just can't seem to get the damned thing finished this heat is really getting to me , work life balance is the worst it's been 3 decent size jobs on the go which I hate, I've got to start turning work away as I'm booked up till end of October . Regards kop
 

Attachments

  • IMG_20220812_123026553.jpg
    IMG_20220812_123026553.jpg
    279 KB · Views: 58
  • IMG_20220812_163947801.jpg
    IMG_20220812_163947801.jpg
    212.6 KB · Views: 26
  • IMG_20220812_164105983.jpg
    IMG_20220812_164105983.jpg
    284.5 KB · Views: 19
  • IMG_20220812_164059513.jpg
    IMG_20220812_164059513.jpg
    443.8 KB · Views: 22
Got the boiler finished off today a little annoying I had to run a cable from the pump direct to the boiler for overun have a relaxing weekend chaps
 

Attachments

  • IMG_20220813_123018706.jpg
    IMG_20220813_123018706.jpg
    496.8 KB · Views: 21
  • IMG_20220813_142934719.jpg
    IMG_20220813_142934719.jpg
    525.1 KB · Views: 20
  • IMG_20220813_142829344.jpg
    IMG_20220813_142829344.jpg
    489.7 KB · Views: 18
  • IMG_20220813_142817020.jpg
    IMG_20220813_142817020.jpg
    537.4 KB · Views: 34
Just finished this off on Friday.
 

Attachments

  • 35BEE767-B068-499D-85AF-CC8FD35CC432.jpeg
    35BEE767-B068-499D-85AF-CC8FD35CC432.jpeg
    462 KB · Views: 22
  • 0194272D-C096-4129-A797-A4D0C7986258.jpeg
    0194272D-C096-4129-A797-A4D0C7986258.jpeg
    311.6 KB · Views: 24
  • 81BF1306-9D54-4E8B-AC36-C2D39AD3417D.jpeg
    81BF1306-9D54-4E8B-AC36-C2D39AD3417D.jpeg
    441 KB · Views: 23
  • 444B818B-08D0-48B2-ACE6-78E6BB3826ED.jpeg
    444B818B-08D0-48B2-ACE6-78E6BB3826ED.jpeg
    476.8 KB · Views: 26
  • 46533B23-8B3C-492A-A5C5-5868169817E6.jpeg
    46533B23-8B3C-492A-A5C5-5868169817E6.jpeg
    490.5 KB · Views: 34
Labour and supplying stuff and materials (Excluding Tiles, customer supplied) £9k inc VAT. Although really should have been a bit more, was quoted at our old labour prices.

Although there was very little electrical works on this one, plus everything basically stopped in the same place.

Floor was a mess underneath so was another £250 on top of above for redoing floor too.
 

Reply to What we all working on this week ? in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Similar plumbing topics

Hi guys....we have an old Astracast sink top....I think its a composite sink....has a big single bowl. My wife thinks it looks scruffy....looks...
Replies
2
Views
224
Hi, Can anyone advise as to why the cold water to my bathroom keeps airlocking? This originally happened about 12 months ago and has happened 3-4...
Replies
9
Views
457
Hello plumbers in my internet. So the Mrs want a spray mixer tap in the kitchen as we had two separate taps. I changed the tap for a temporary two...
Replies
2
Views
220
We run a community village hall and have a large kitchen provided for the use of hirers. This includes a Lincat SLR9 gas cooker which I believe is...
Replies
5
Views
555

Newest Plumbing Threads

Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock