3

34stuey

Calculating CH system requirements using STARS. Interested in advanced level guidance or experience when using stars to calculate the requirements for an entrance hall with an open double height storey staircase and open 1st flr landing.
The current model for this space, as part of the overall property model, is set up as the entrance hall, the double height staircase and the landing as three separate room models.
I assume that as the required BTU's are given for the three spaces i could add these together and select 2 radiators one on landing and one within hallwayrather than the 3 calculated for each space.
The current 40yr old system has three rads in this space, 1 in hallway, 1 at bottom of stairs (i would like to do away with this one) and one on landing.
Look forward to hearing from the STARS stars out there.
Thanks, S.
 
Status
Not open for further replies.

Reply to Using Stelrad Stars - advanced level in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Similar plumbing topics

We have an all Vaillant setup - an EcoTEC Plus 637 system boiler plus wired VR720 and VR92 SensoCOMFORT controller, driving two CH zones plus DHW...
Replies
4
Views
611
I have a 320 sqft double storey house with 6 bedrooms. The house is serviced by two heat only boilers (non condensing); a 120k btu (35kw) and a...
Replies
17
Views
1K
Hi all, I have a Heatmiser UFH installation, 7-8 years old now. This week we noticed that a few of our heating zones were not warming up, even...
Replies
1
Views
1K
Hi, sorry this is so long. I have tried to give all relevant info. We are building a new, small, two-storey house that is off grid for power...
Replies
3
Views
939
Hi everyone, I'm looking for some advice please. My system has 5 Drayton Wiser TRVs. There are 8 rads over 3 storeys and a 170l unvented...
Replies
10
Views
2K