Hey. 1st post so sorry if it's been asked/answered before.
Gas safe engineer for 13 years but through my firm which I still work for. 3 months ago I applied for my own registration number so I can do minor gas works outside of my normal working hours. Now out of my probation period. The advice I'm seeking is that I've had a friend who asked to have a new boiler fitted. Change from a non condensing system to a condensing boiler system. Boiler going in the same place. Use the same flue hole. Run condensation, upgrade 15m of gas pipe to 28mm, full power flush and fit A magnaclean filter. He will buy everything so I only charge labour. That's what I'm struggling with. I haven't a clue how to charge for something like this. Do I charge hourly? Is there a rough guide as to what to charge that someone could help me with.
Any advice appreciated
 
day rate i would allow 3-5 days depending on what needs to be done
 
No sorry Scott. . Keep a system boiler but condensening. Minimum pipework alterations to boiler. Apart from gas pipe upgrade.
 
Hey. MI require 20 mbar working pressure. Comes out of the floor in 15 mm copper to the original boiler and disappears. 22 mm comes out of the meter which is the other side of the house. Airing on the side of caution and experienced I wanna upgrade it.
 
What size boiler ?
 
What area do you live in?

In London I would price this by the day but you need to weigh up what you need to cover your time and what you want a friend to pay, most companies I have subbed to would charge anywhere from 4-600 a day for this type of work.
 
If you want to be really cheeky, phone up some local guys and ask them for a rough price on what they would charge for the job and knock what you feel is reasonable off for you friend, but thats if you want to be cheeky... Its hard for someone to answer that as the price of the job in London will be a lot more than the price of a job elsewhere etc. :rolleyes:
 
I don’t agree with that one Shaun.
Bit too generalised for me.

25kw, 15m and 6 elbows gives you a pressure loss of around 0.90

Putting two lengths of 28 in would drop this to around 0.50
 
25kw, 15m and 6 elbows gives you a pressure loss of around 0.90

Putting two lengths of 28 in would drop this to around 0.50


It would be 0.7 but the point is? Why aim for 0.5mb?


I've been installing industrial Gas installations of all sizes and Commercial and Domestic Heating installations for 30 years.

To say any more than 4 elbows on an installation to a 25 kw boiler needs 28mm pipe is wrong.

I don't agree with giving advice like that Shaun. It benefits no-one. Installing 28mm pipe on that installation is a waste of money and advertises that the installer didn't understand what he/she was doing.

In my opinion.
 
Because I slightly over spec, op doesn't say if there's a gas cooker / fire on site / planning one in the future etc

If the customer would want one your going to have to change/ up the line as it will be over spec
 
op doesn't say if there's a gas cooker / fire on site / planning one in the future etc

The OP doesn't say much about the installation, as in distance, route, other appliances etc. That's why I queried the 28mm decision.

As far as over spec, If the customer said they were thinking of additional appliances in the near future, I would size accordingly. If they were not, I would look at it that any increase in pipe size in the future is up to the Engineer who is dealing with it. Every situation should be taken on its own merits !

I suppose we all do things different.
 
To be fair. The length of the run is 15M, gonna have 10 elbows on the run. Also there is an existing range cooker on the run. I will have to get books and and do some pipesizing exercise to determine how much 28mm to run.
 
Cooker size
how far from the meter
Elbows on that run

?
 
My 2 cents. Any boiler change, for a standard customer I charge at least ÂŁ750 up to a ÂŁ1000...Labour... for friends I've don't ÂŁ500 for a few days work, but luckily i don't have many friends.. for close family ÂŁ150 or something so they don't cost me money... I charge half what British gas would, so i don't loose sleep at night over my prices. They get a years no fuss guarantee on my work and obviously anything that comes with the appliance installed.
I like when this subject comes up, always interesting to hear how people charge... especially the guys that tend to be up north doing new boiler installs for a few hundred quid
 
Status
Not open for further replies.

Reply to Pricing a boiler change in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Similar plumbing topics

i can't tell if my shower tap (cock stop) is leaking or not ...............so after showering, the shower head will drip fast for 2 hours, then drip slowly after that...........i put a bucket under the shower head to collect the water for 26 hours the first time.............then 19 hours the...
Replies
0
Views
247
I currently have a Vaillant ecoTEC Plus 438 system boiler which is 13 years old. I have been having problems with the boiler which potentially boils down to the heat exchanger so I am now looking to bite the bullet and have a new boiler installed. My set up at home is that I have a 4-bed...
Replies
6
Views
696
I'm going to have my bathroom renovated and that includes changing my rusty old rad for a towel rail. I wanna cut down the costs as much as possible so there's things I want to do myself. In order to change the rad I'll have to turn off the lock shields then slowly drain the rad. The thing is...
Replies
4
Views
476
V
Good morning, I thought I would try here first before going elsewhere. in short I had a septic system flexible coupling needing replacing. Backed up waste water. It was less than a meter down and took plumbers less than 1/2 to diagnose I was charged $1560 originally Spoke to plumber to contest...
Replies
3
Views
402
Hi everyone I hope you can help. We were getting some work done and our builder attached the boiler condensate pipe to the sink waste pipe. This was all then covered with dot and dab. Shown in the picture, red arrow. So the only thing visible now is a round pipe from the wall. We are yet to fit...
Replies
5
Views
347
Creating content since 2001. Untold Media.

Newest Plumbing Threads

Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock