- Messages
- 7,712
Any of you lot doing price increases on any of your rates this year??
Discuss price Increase in the Plumbing Jobs | The Job-board area at PlumbersForums.net
. I feel i need to earn more
No price increase but going to try a different approach for boiler quotes
Just quote the minimum then offer filter, flush, shock arrest & controls etc etc as an extra instead of a high price including everything to meet MIs
Seem to be losing out on too many
I'm going to start offering cheaper option boilers with increased margin. I'm sure people just see the bottom line.
All controls are extra options, if they don't want them so be it. But I will still insist on fitting Magna cleans, I don't need want the manufacturers slating me for sludge.
Do you also fit a lime fighter and shock arrestor as standard?
Vaillant?Never needed either of those. hex,s are stainless steel, so nothing sticks to them. Never had one block in the domestic side.
Never needed a shock arrestor either.
Vaillant?
Worth checking the Manufacturers instructions, I think most state thats its required now.
I'm going to start offering cheaper option boilers with increased margin. I'm sure people just see the bottom line.
All controls are extra options, if they don't want them so be it. But I will still insist on fitting Magna cleans, I don't need want the manufacturers slating me for sludge.
same here increase profit margins. And split the customers from tights arses and quality customers and quote accordinglyNo price increase but going to try a different approach for boiler quotes
Just quote the minimum then offer filter, flush, shock arrest & controls etc etc as an extra instead of a high price including everything to meet MIs
Seem to be losing out on too many
I'm going to start offering cheaper option boilers with increased margin. I'm sure people just see the bottom line.
All controls are extra options, if they don't want them so be it. But I will still insist on fitting Magna cleans, I don't need want the manufacturers slating me for sludge.
I like mains but by blikin flip they are heavyBaxi, or Mains if there landlords.
I like mains but by blikin flip they are heavy
Ive know people slating ideal at moment.I like the Ideal independant just not sure about Ideal at the moment
if they do i always speak to rep and it gets sorted.I have called them out twice, both times fixed without a problem but it took too long for them to come both times.
On a boiler under 12months 3/4 days wait isnt good enough
Reply to price Increase in the Plumbing Jobs | The Job-board area at PlumbersForums.net
We get it, advertisements are annoying!
Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.