lambchop81
Hi all,ave few enquiries regarding new boiler installation with powerflush.
Was advised that job would take two days, first day they will fit new boiler and second do the powerflush.
Upon questioning why they`re not doing powerflush first was told central heating not going to be used so no debris will enter new boiler.
Upon coming home first day was told boiler is all functional and benchmark sheet was all filled up.
Were they able to get values for central heating mode without firing central heating and thus getting debris into new boiler before doing powerflush?
And second question is regarding gas leak.
It was discovered only on second day when they came to do powerflush, later was fixed but was advised that there will be extra charge.
Now, am I right in thinking that they must have caused leak as none was advised during first day, and to best of my knowledge duty of care requires engineer to check tightness before and after any work done?
Thanks for your help
Was advised that job would take two days, first day they will fit new boiler and second do the powerflush.
Upon questioning why they`re not doing powerflush first was told central heating not going to be used so no debris will enter new boiler.
Upon coming home first day was told boiler is all functional and benchmark sheet was all filled up.
Were they able to get values for central heating mode without firing central heating and thus getting debris into new boiler before doing powerflush?
And second question is regarding gas leak.
It was discovered only on second day when they came to do powerflush, later was fixed but was advised that there will be extra charge.
Now, am I right in thinking that they must have caused leak as none was advised during first day, and to best of my knowledge duty of care requires engineer to check tightness before and after any work done?
Thanks for your help