Do kitchen sinks get serviced? 😁

Joking aside, it’s probably a poke and go, a lot of our customers say to me, “it only got serviced last week”, I then proceed to tell them “it’s not a service it’s a safety check” :rolleyes:

the classic bg safety check :D
 
Do kitchen sinks get serviced? 😁

Joking aside, it’s probably a poke and go, a lot of our customers say to me, “it only got serviced last week”, I then proceed to tell them “it’s not a service it’s a safety check” :rolleyes:

Same with the oil boilers, start pulling out the baffles and customer asks what you doing as nobody has done that before.
 
Well looks like I wont be doing the chapel after all, bloke thinks my price for first fix and boiler/cylinder is too expensive. Put in 13 days all on copper. 4 1/2 days for boiler and cylinder room inc controls wiring. 4 days to first fix the three bathrooms. 1 day for kitchen and cloakroom. 1 day to fill and pressure test. 1/2 day for oil line (not an easy run). 1 day to flush refill and commission boiler and a days feck factor.
Never mind.
Win some you loose some mate 😉
 
Another bathroom started this week chaps getting the tiling done a new going up ceiling up tomorrow . Kop
[automerge]1594790840[/automerge]
)
Service the standard thing it’s been serviced every year :D
Yeh yeh heard it all before 😂😂
 

Attachments

  • IMG_20200713_084243.jpg
    IMG_20200713_084243.jpg
    103.3 KB · Views: 15
  • IMG_20200713_084256.jpg
    IMG_20200713_084256.jpg
    113.1 KB · Views: 15
  • MVIMG_20200714_181008.jpg
    MVIMG_20200714_181008.jpg
    121.7 KB · Views: 19
Last edited:
Hi Guys, having a 'mare today with a "simple" towel rail job for my uncle. Doing it purely for the love of plumbing for free of course 😵 on my day off.

Old rail a tiny bit rusty so he's bought an new one (Years left in the old one if you ask me!). Exactly the same as the old one he says. Easy job he says. Apart from the new rail is not the same, the spacings between the bars are different and the height is different so the fixings don't line up and even moving just the bottom fixing leaves the pipes either too long or too short no matter what I do. I don't work out of a van any more so what would normally be a fairly easy job is a pain in the arse with drilling tiles and making good and extending pipes, most probably. Because I'm not carrying the right kit in the car for a "simple" "identical" rail swap I've got to go into work tomorrow and get the right kit and drive across the island again on my next day off.

So I'm going back tomorrow to just redo the thing basically from scratch, freeze the pipes and extend them into the new rail about an inch. 😖 Or maybe just move all the fixings.

In reality nothing major in the grand scheme but still a PITA! Ahh that's better getting that off my chest.

Oh I forgot, he does pay me - In old (still good nick though) clothes of his which would be great if he wasn't about 5 stone heavier than me. 😂
[automerge]1594832222[/automerge]
Same with the oil boilers, start pulling out the baffles and customer asks what you doing as nobody has done that before.

Now that's a familiar one! When I used to work regularly with oil, I've lost count of the amount of times someone has complained because "Why is it taking you so long? The last guy was always in and out in 20 minutes?" I've even had one or two ask me if I'm sure I know what I'm doing!

The firm I worked for charged £100 to do a proper service, oil filter cartridge, new burner hoses where needed and I played that better safe than sorry, full clean out of the combustion chamber, baffles and secondary heat exchanger turbulator jobbies cleaned, fire valve test, burner set up properly again, new nozzle if needed, flue gas analysis, photocell test, and proper paperwork. Used to take me about an hour or a bit longer if the boiler was filthy which it usually was.

They'd complain that the last bloke did it for £80 and only took 20 minutes. I tried to explain that they were paying him £80 to not have their boiler serviced and paying us £100 to have the full works. Some people then understood but others thought I was taking the p*ss.

I don't miss that rubbish any more that's for sure.
 
Last edited:
Progress report chaps all working out did make a boo boo on drilling a panel though which is gonna cost me grrrr and cause a bit of inconvenience for my customer s___ happens . Kop
 

Attachments

  • IMG_20200716_100345.jpg
    IMG_20200716_100345.jpg
    126.3 KB · Views: 19
  • IMG_20200716_125747.jpg
    IMG_20200716_125747.jpg
    131.2 KB · Views: 19
  • IMG_20200716_185401.jpg
    IMG_20200716_185401.jpg
    106.8 KB · Views: 16
dont think the customers going to be happy with the shower head on a bright yellow hose :D looks good kop
 
dont think the customers going to be happy with the shower head on a bright yellow hose :D looks good kop
Needed flushing and testing Shaun better to be safe than sorry . Kop
[automerge]1595007208[/automerge]
Weekend off this can wait until Monday 😊 have a good weekend chaps . Regards kop
 

Attachments

  • IMG_20200717_170837.jpg
    IMG_20200717_170837.jpg
    107.2 KB · Views: 11
  • IMG_20200717_171032.jpg
    IMG_20200717_171032.jpg
    130.7 KB · Views: 19
Last edited:
Bathroom refresh. Everything staying but new tiles, new flooring and new bath panel.

Got to love a small tile.
 

Attachments

  • 20200721_133130.jpg
    20200721_133130.jpg
    135.2 KB · Views: 14
  • 20200721_133119.jpg
    20200721_133119.jpg
    122.5 KB · Views: 15

Reply to What we all working on this week ? in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Newest Plumbing Threads

Back
Top