- Messages
- 6,157
Looking good mate what leveling systems that ?On with this at the minute, they’ve lived there 55 years and never touched the bathroom. Awkward room for a layout, so done some shifting about.
Discuss What we all working on this week ? in the Plumbing Jobs | The Job-board area at PlumbersForums.net
Looking good mate what leveling systems that ?On with this at the minute, they’ve lived there 55 years and never touched the bathroom. Awkward room for a layout, so done some shifting about.
Genesis 2mm.Looking good mate what leveling systems that ?
Fs run out of tiles and can't get any till Tuesday / wednesday customer supplied everything so it's not my doingCracking on need to get this tiled today clients are home from the USA at the weekend, all going well but lost 2 days last week on another job so I'm playing catch up
I always over estimate and then add a metre on, two if they’re to order. Half of them come damaged these days, plus if they’re 1200*600 like some have that’s a lot of area if one tile is damaged.Fs run out of tiles and can't get any till Tuesday / wednesday customer supplied everything so it's not my doing
Yes mate know what your saying your job turned out nice bet they were well happy .I always over estimate and then add a metre on, two if they’re to order. Half of them come damaged these days, plus if they’re 1200*600 like some have that’s a lot of area if one tile is damaged.
Try and not do any OV anymore, try and convert them all to system boilers to save this hassle. Spent more time venting than fitting the dam things sometimesManaged to squeeze in a ho that was a sod to vent
Really nice transformation mate out of interest how long did it take ? Regards KopJust finished this in time for the weekend. Roll on Monday and another job
8 days, 2 menReally nice transformation mate out of interest how long did it take ? Regards Kop
You done well on to the next one8 days, 2 men
Thought that was only for heatpumps ? and you need MCS registration they may have had a pay back when they had the biomass boiler fitted ? but that's long gone now , Rumor has it Rishi has plans to squash that as a waste of money, a average heatpump install is around £13000 - £5000 pay back leaves £8000 to pay so out of reach for Mr & Mrs average this scheme is paying wealthy people to install heatpumps at a discount the money would be better spent insulating people's homes so they don't need their boilers on for so long and their homes then retain the heat generated, as a consequence boiler emmisions are reduced helping achieve net zero. ? . Regards KopWell catching up on servicing before starting a boiler install next Thursday. Oil to replace Bio Mass. Customer phones this morning, been talking to a friend, I should be able to get 5k off the government, can I sort it, No. Boilers on order from Hounsfield, tanks coming thursday/friday and just bought all the controls and fittings. They've paid a deposit to cover all materials and my % on top.
Told them to start looking into it. But that the boiler, tank and bits theirs now regardless of what happens.
Love my job.
Yes, I had a quick look at the bumf around it all. They dont qualify.Thought that was only for heatpumps ? and you need MCS registration they may have had a pay back when they had the biomass boiler fitted ? but that's long gone now , Rumor has it Rishi has plans to squash that as a waste of money, a average heatpump install is around £13000 - £5000 pay back leaves £8000 to pay so out of reach for Mr & Mrs average this scheme is paying wealthy people to install heatpumps at a discount the money would be better spent insulating people's homes so they don't need their boilers on for so long and their homes then retain the heat generated, as a consequence boiler emmisions are reduced helping achieve net zero. ? . Regards Kop
Not sure if it’s the same, but I've seen some housing stock near ours built with no fines have had an outer layer installed, not sure if they used something like polystyrene blocks or similar.Not a lot you can do with a rubble filled twin stone wall.
Reported?Kitchen fitter had capped off the gas hob with a push fit stop end.
Probably should have but I do t need the hassleReported?
Finished and dressed by clientGot this one finished just needs decorating before toothbrush charger illuminated mirror, bathroom cabinet and shaving mirror can go up, I would recommend Flova brassware if you want something a little different you can feel the quality and the customer service team were a pleasure to deal with , a week ahead of small jobs before another bathroom and a ensuite and a heating upgrade.
Regards Kop
Thought that was a boiler above the bog at first glanceFinished and dressed by client
Looking forward to a few pictures budLooking good @king of pipes About to start our next one on Monday, last of year.
Reply to What we all working on this week ? in the Plumbing Jobs | The Job-board area at PlumbersForums.net
We get it, advertisements are annoying!
Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.