- Messages
- 578
Approximately 35m soil and gravel top remaing 7/8m is patio slabs. I did have a though that if I could expose the pipework in a few places, easier said than done mind, is it possible to hire a freezing machine suitable for mpde in that way I could isolate sections as suggested previously?What is the surface of the route from meter to stopcock?
By which I mean; tarmac, slabs, grass concrete etc etc.