Search the forum,

Discuss Gravity to fully pumped in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Status
Not open for further replies.
Messages
32
installing a W/Bosch 24ri supplied by client.
Existing is Kingfisher2 MF, on GR floor & HW cylinder on 1st floor with C plan thermostat/Mot valve controlled Gravity circuit.
Not easy to get additional pipework up to cylinder, so whats the best way to convert to fully pumped. It has a combined CF & vent off the primary flow @cylinder.
Is there a potential problem with putting the pump on the return near the boiler, with Motorised valves for CH & HW before it and an auto bypass.
Thanks for any comments.
PS thought honeywell say don't put valves there but not sure why ?
 
Status
Not open for further replies.

Reply to Gravity to fully pumped in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Creating content since 2001. Untold Media.

Newest Plumbing Threads

Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock