Hi all. Usual thing, existing floor standing gas boiler is pumped for CH and running into a 28mm cylinder coil for DHW.

I am planning on capping off the CH flow and return at the boiler and converting the system into a y-plan fully pumped system.

Question for all. I realise the pipework is in 28mm for decent circulation by gravity. Is there any reason why I can't fit a 22mm y-plan kit then just use a 22/28 reducer after the valve to connect on to the existing 28mm?

I can't see a problem with this but wanted to check with people who have more experience of doing this than I!
 
That's how I've done them with no problems, just make sure there's no non return valve on it.
 
Will be fine imho.

might want to put a balancing valve in though?
more experianced guys can confirm this?
 
Will be fine imho.

might want to put a balancing valve in though?
more experianced guys can confirm this?

Do you mean a gate valve on the cylinder return? If yes it's not a bad idea, it'll help the heating circulation while there's hot water demand.
 
Jesus man alive . What are you on? Old. 28mm left in? Give your self a shake. That's loot.

I would try and use 22mm and fit s plan . Defo fit gate valve to cylinder. You know any sparkies who could wire s plan?
 
qe5a2e6a.jpg
 
Jesus man alive . What are you on? Old. 28mm left in? Give your self a shake. That's loot.

I would try and use 22mm and fit s plan . Defo fit gate valve to cylinder. You know any sparkies who could wire s plan?

I agree but even though the customer is moving in to the place he is doing everything as cheap as possible. Instead of going fully pumped he is now on about fitting a c plan kit..

I have informed him that my labour is the same either way. I know which one I would be fitting.

and no, I don't know any sparky that can wire an s plan sadly :)
 
Status
Not open for further replies.

Reply to Been asked to convert existing gravity HW to fully pumped system. in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Similar plumbing topics

  • Question
Central Heating Pump - G Pump Force HE-RS25/6PWM-130 Hi, I would be grateful if someone could explain whether our CH system can cope with the...
Replies
7
Views
613
    • Like
Hello, my Mothers heating failed in the recent UK cold snap. I found the pump was stuck. I have a question about pump orientation. The...
Replies
8
Views
675
Hi All, Looking for a bit of advice on the best way to pipe this. - 24kW Worcester regular boiler in kitchen, approx. 9 years old - unvented...
Replies
16
Views
1K
Hi, I am replacing our 11 year old boiler (due to H.Ex. leak) with a new one. This is in a "sealed" system with red expansion vessel in airig...
Replies
3
Views
545
AFAIK the boiler is set to fully pumped. (The switch inside is on fully pumped), however the pump is only running while the boiler burner is...
Replies
1
Views
726
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock