Search the forum,

Discuss Newly qualified gas engineer help?!! in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Status
Not open for further replies.
Messages
8
Just recently qualified gas as a engineer just over 2 months, been working for the company for 2/3 years, just wondered what type of wage I should be on a year or month?
 
And what did you do before you were gas safe?
Do you work unsupervised or out with another guy?
 
If they paid for your courses and you are still learning I don't imagine you would get much of a pay rise
 
Status
Not open for further replies.

Reply to Newly qualified gas engineer help?!! in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Similar plumbing topics

B
  • Locked
Hi All, I am a 16 year old school leaver (Sept 23) looking for a local company to take me on as an apprentice plumber. I live in Benfleet and am looking to join a plumbing and heating engineer 4 days a week whilst I attend College to gain my level 3 plumbing and heating qualifications. if...
Replies
0
Views
49
Billy Barnard
B
  • Article
A Plumber Who Worked Illegally Gets A Suspended Sentence After Falsely Claiming To Be Gas Safe Registered. A Plumber in Herefordshire was prosecuted after Hereford Trading Standards Team found that he was falsely claiming to be on the Gas Safe Register when he was not, putting members of the...
Replies
0
Views
199
We run a community village hall and have a large kitchen provided for the use of hirers. This includes a Lincat SLR9 gas cooker which I believe is a 23.8Kw appliance with all six burners and oven on max. This was installed some 10 years ago and has passed all subsequent Gas Safety inspections as...
Replies
5
Views
501
    • Like
  • Sticky
We have 2 brand new cordless, battery powered press tools in stock, and flying off the shelves. Our TekTools TZ1930 & TZ1550 are packed with advanced features - these cordless press tools are engineered for speed, precision, and ease of use across various applications. Just reply to this thread...
Replies
5
Views
934
We are from Alberta, and I own an electrical company. I have been asked by a BC Mechanical P. Eng. to install an emergency STOP button at the man-door to the boiler room. It's intent is to 'halt' the operation of the boilers in the room should there be an emergency. He is demanding that I do...
Replies
5
Views
289
Creating content since 2001. Untold Media.

Newest Plumbing Threads

Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock