We are in the process of renovating a kitchen and bathroom and want to replace the majority of water plumbing. Current pipework is ancient, mainly done with compression fittings. New central heating was installed about 8 years ago but was joines to old pipework. Hot pipe runs in 15mm from boiler then enlarged to 22mm after about 0.5m to bath reducing tee to bath hot bath tap in 22mm then 15mm from tee to basin them down into kitchen to tee for washing machine then elbow to kitchen sink.

Cold water returns from supply by kitchen sink in 15mm tee to sink, tee to washing machine, tee to outside tap, then up to bathroomm tee to toilet, then basin, then bathen then to combi boiler.

Boiler is vailiant condensing with warm start.

What size should i replace pipe with or should i stick with current arrangement only addition would be a cold tee after bath for electric shower. Planning to replumb in JG plastic.

Any help or advice much appreciated.
 
Hi. As you say, the combi was fitted and cistern / cylinder removed. The 15 mm hot just stabbed in to a local hot supply (rather than striping out 22 mm) 15 mm is the standard for that type of system. Good Luck
 
I would try and get as much 22mm from your main to the last tee before your boiler, this will increase your flow when you use more than one thing
 
15mm's fine for hot from a combi, if you use 22mm you waste gas heating up all that extra water so that it can just cool back down again in the pipe.
It used to be better to run in 22mm from a gravity fed water tank, it's not the case now though.
 
i agree with gary that it may be a good idea to run some 22mm on the cold. Or run a seperate cold to the boiler and make it your first tee after the stop tap.Normally you would not do this unless its a new build or your gutting and replacing everything.
 
Status
Not open for further replies.

Reply to Help Needed for kitchen bathroom renovation in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Similar plumbing topics

Hello plumbers in my internet. So the Mrs want a spray mixer tap in the kitchen as we had two separate taps. I changed the tap for a temporary two...
Replies
2
Views
215
S
Hi, I seemed to have a blockage in kitchen sink. A plumber came and cleared all the pipework that is visible inside my home (there was debris and...
Replies
2
Views
155
Sonya K
S
Hi all, I'm installing a concrete patio out back. By the wall under the kitchen sink I have an existing P-Trap gully for the grey water from the...
Replies
0
Views
174
  • Question
Ideal Logic 24, Previous problem was that the hot water was only cold or barely warm if the heating was in use. If heating was off and boiler cold...
Replies
2
Views
213
Hi, Can anyone advise as to why the cold water to my bathroom keeps airlocking? This originally happened about 12 months ago and has happened 3-4...
Replies
9
Views
435
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock