M
mkjon
current set up: open vented cylinder, oil rayburn with backboiler (previously converted from solid fuel)
the plan: install condensing system boiler, convert rayburn back to solid fuel. link up the two with dunsley / h2
the question:
boiler install is free with grant. they probably won't be willing to link the two systems! how much work involved in the link up if i get a contractor in to do this after the grant people have gone. what do i need to ensure they do / don't do to make susbsequent link up as straightforward as possible.
the plan: install condensing system boiler, convert rayburn back to solid fuel. link up the two with dunsley / h2
the question:
boiler install is free with grant. they probably won't be willing to link the two systems! how much work involved in the link up if i get a contractor in to do this after the grant people have gone. what do i need to ensure they do / don't do to make susbsequent link up as straightforward as possible.