Currently reading:
What we all working on this week ?

Discuss What we all working on this week ? in the Plumbing Jobs | The Job-board area at PlumbersForums.net

king of pipes

Esteemed
Plumber
Gas Engineer
Subscribed
Messages
6,157
I have a insurance job to try and rescue a poorly installed quad shower the customer wants to save the tiling if possible and has a few spare so fingers crossed it may work , the loss adjuster allowed em £1500 that will just about cover materials. Kop
 

Attachments

  • Screenshot_20191031-033038.png
    Screenshot_20191031-033038.png
    400.3 KB · Views: 119
  • Screenshot_20191031-033046.png
    Screenshot_20191031-033046.png
    420 KB · Views: 65
Bathroom is coming on first fix electrics done , the plastering is completed, Dura panel shower boards fitted . Kop
 

Attachments

  • IMG_20230331_171033761_MFNR.jpg
    IMG_20230331_171033761_MFNR.jpg
    133.2 KB · Views: 25
  • IMG_20230330_140730224_MFNR.jpg
    IMG_20230330_140730224_MFNR.jpg
    268.7 KB · Views: 18
  • IMG_20230331_171042806_MFNR.jpg
    IMG_20230331_171042806_MFNR.jpg
    138.5 KB · Views: 17
  • IMG_20230330_140713797_MFNR.jpg
    IMG_20230330_140713797_MFNR.jpg
    284.8 KB · Views: 18
  • IMG_20230330_140659342_MFNR.jpg
    IMG_20230330_140659342_MFNR.jpg
    233.2 KB · Views: 16
  • IMG_20230330_083340518_MFNR.jpg
    IMG_20230330_083340518_MFNR.jpg
    327.3 KB · Views: 20
Pushing to get this completed may happen ?? Shower glass tomorrow then just units to sort out toilet, basin and wall 😉👍
 

Attachments

  • IMG_20230404_143031307_MFNR.jpg
    IMG_20230404_143031307_MFNR.jpg
    262.5 KB · Views: 13
  • IMG_20230404_143020223_MFNR.jpg
    IMG_20230404_143020223_MFNR.jpg
    321 KB · Views: 17
  • IMG_20230404_143134742_MFNR.jpg
    IMG_20230404_143134742_MFNR.jpg
    293.9 KB · Views: 18
  • IMG_20230404_143039800_MFNR.jpg
    IMG_20230404_143039800_MFNR.jpg
    198.2 KB · Views: 15
  • IMG_20230404_154654763_MFNR.jpg
    IMG_20230404_154654763_MFNR.jpg
    281.8 KB · Views: 21
Damages and missing parts put pay to finishing today kin B&Q at least the showers complete and working customer is sound about it.
Have a great bank holiday chaps the weather forecast is descent so hopefully we can get out and about. Kop
 

Attachments

  • IMG_20230405_133144582_MFNR.jpg
    IMG_20230405_133144582_MFNR.jpg
    322.2 KB · Views: 19
  • IMG_20230405_133134060_MFNR.jpg
    IMG_20230405_133134060_MFNR.jpg
    312.3 KB · Views: 18
  • IMG_20230406_135604000_MFNR.jpg
    IMG_20230406_135604000_MFNR.jpg
    248.6 KB · Views: 17
Started the post easter season with a syphon change, rusted cistern nuts real tip. Moved onto taking a customer through last week's changes to heating system and collecting the £2.5k. Finished off with a nice outside tap washer change and a sort out of the under sink waste plumbing. Followed by the whilst you're here can you tell me if I can split my bathroom in two adding an extra toilet and basin.

Nice easy finishing off new water supply to replace old steel feed tomorrow, as long as Northumbrian Water turn up. Looking for a short day.


Thursday cancelled today as they've just booked up to go away for a week from tomorrow. So looking at pulling the three jobs from Friday into Thursday and having another long weekend.
 
Welcome to the chit hole. Damp got nothing on this. Both boss's behind wall been leaking, overflow from toilet just on the floor in the void and light doesn't work.
Soon make something of it.
 

Attachments

  • 20230418_143315.jpg
    20230418_143315.jpg
    681.3 KB · Views: 18
  • 20230418_143317.jpg
    20230418_143317.jpg
    483.5 KB · Views: 21
Shower room finished off customer getting his own flooring done , I had to swap the door around which was a pita want that little bit more room to get in and out ?? Regards kop
 

Attachments

  • IMG_20230419_100317641_MFNR.jpg
    IMG_20230419_100317641_MFNR.jpg
    242.6 KB · Views: 16
  • IMG_20230419_100305833_MFNR.jpg
    IMG_20230419_100305833_MFNR.jpg
    323.7 KB · Views: 16
  • IMG_20230419_100344969_MFNR.jpg
    IMG_20230419_100344969_MFNR.jpg
    543.9 KB · Views: 15
Thought it might be salvageable, but damage too severe. Insurance job so new boiler. Fire investigator was there when I called in. No accelerants, didn't start from boiler or oil line, possibly a lithium battery in wheelie bin but cause is officially unexplained. Luckily the boiler stopped the propane tanks exploding.
 

Attachments

  • 20230421_122738.jpg
    20230421_122738.jpg
    778.6 KB · Views: 28
  • 20230421_122732.jpg
    20230421_122732.jpg
    1 MB · Views: 34
Thought it might be salvageable, but damage too severe. Insurance job so new boiler. Fire investigator was there when I called in. No accelerants, didn't start from boiler or oil line, possibly a lithium battery in wheelie bin but cause is officially unexplained. Luckily the boiler stopped the propane tanks exploding.
Ooh it could of been a whole lot worse then mate 😕
 
Well there's an hour I won't get back.
Asked to have a look at first fixing for a bathroom and en-suite.
No hot, cold, waste or soil pipework upstairs.
Saniflo for ensuite.
Hot and cold to be picked up from by the boiler and ran through pitched single storey roof space, tee off into ensuite and then into bathroom.
En-suite has thermo shower, basin and wc.
Bathroom has bath, electric shower over, basin and wc.
New 4" soil from wc in bathroom drop into roof space, drop through ceiling, run just below ceiling, core through external wall, tee, new stack only 1 story and connect into existing stack 2m away.
Plus waste pipes for above and connection and pipe for saniflow.
Gives me the plan, attached, then tells me he has a price already. £1,350.00. I told him to snap his hand off.
 

Attachments

  • WIN_20230425_19_03_56_Pro.jpg
    WIN_20230425_19_03_56_Pro.jpg
    157.3 KB · Views: 25
Including materials?
 
Second fixing week
 

Attachments

  • C564A98E-A49E-4D61-901A-9B78B3CDF1A8.jpeg
    C564A98E-A49E-4D61-901A-9B78B3CDF1A8.jpeg
    367.9 KB · Views: 22
  • 1AB13DB3-38EF-4DBC-B768-58ADA960DBC7.jpeg
    1AB13DB3-38EF-4DBC-B768-58ADA960DBC7.jpeg
    298.8 KB · Views: 24
  • 8CD0168D-2906-41C6-9C0C-5634055B528B.jpeg
    8CD0168D-2906-41C6-9C0C-5634055B528B.jpeg
    494.3 KB · Views: 27
  • 524F307A-4E2B-4D45-8D2A-35591B9F90D8.jpeg
    524F307A-4E2B-4D45-8D2A-35591B9F90D8.jpeg
    221.4 KB · Views: 18

Reply to What we all working on this week ? in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Back
Top