king of pipes

Esteemed
Plumber
Gas Engineer
Subscribed
Messages
6,158
I have a insurance job to try and rescue a poorly installed quad shower the customer wants to save the tiling if possible and has a few spare so fingers crossed it may work , the loss adjuster allowed em £1500 that will just about cover materials. Kop
 

Attachments

  • Screenshot_20191031-033038.png
    Screenshot_20191031-033038.png
    400.3 KB · Views: 114
  • Screenshot_20191031-033046.png
    Screenshot_20191031-033046.png
    420 KB · Views: 65
Boiler £492 + Vat - flue £69 - 29 + Vat Scott, I got the boiler & flue , Honeywell T4 , Magnaclean micro , chemicals , 6m of 22mm + 6m of 15mm , £180 piece fittings bucket , filling loop and 15mm salamander inline descaler for £1000. Cheers kop
 
Agreed mate I supposed they are aimed at rental and landlord type properties may be ? add a stat job done may not meet boilier plus but loads out there that don't and who is going to police it nowadays a the best bud . Kop
You can’t meet boiler plus with the mechanical clock and room stat as far as I know.
So you need Weather comp.
Or an external programmer/stat and tell the user not to touch the built in timer as it must be permanently on.

I fitted an Independant c24 recently for a landord, I used a Salus wireless room stat as it was the cheapest available. Doesn’t comply but like you say, who’s going to check.
 
You can’t meet boiler plus with the mechanical clock and room stat as far as I know.
So you need Weather comp.
Or an external programmer/stat and tell the user not to touch the built in timer as it must be permanently on.

I fitted an Independant c24 recently for a landord, I used a Salus wireless room stat as it was the cheapest available. Doesn’t comply but like you say, who’s going to check.
That's what I did mate timer on constant and Programmable Honeywell T4 which meets boiler plus bud .
[automerge]1587622515[/automerge]
Better picture Scott
 

Attachments

  • Screenshot_20200422-185305.png
    Screenshot_20200422-185305.png
    252.5 KB · Views: 18
  • Screenshot_20200422-190206.png
    Screenshot_20200422-190206.png
    324.4 KB · Views: 21
Last edited:
My first biggish job near completion since lockdown started stripping out Thursday and Friday last week , this shower room needed turning round quickly so went for multi panel to blend in with the existing tile that was installed 5 years ago and still looking good , the Victoria plumb shower and tray installed hadn't faired so well was leaking badly and looked shabby , I installed a Aqualisa Zuri smart shower with the processor box installed above in the loft connected to a Viessman 100 combi and Qualitex shower tray and wetroom glass, just the wiring, commissioning, lagging , and the clearing up to do today so 4.5 days which I think is reasonable cheers chaps keep safe . Kop
 

Attachments

  • IMG_20200611_161234.jpg
    IMG_20200611_161234.jpg
    116.3 KB · Views: 17
  • IMG_20200612_134110.jpg
    IMG_20200612_134110.jpg
    107.1 KB · Views: 17
  • IMG_20200615_162825.jpg
    IMG_20200615_162825.jpg
    70.1 KB · Views: 19
  • IMG_20200616_164111.jpg
    IMG_20200616_164111.jpg
    81.6 KB · Views: 14
  • IMG_20200616_145550.jpg
    IMG_20200616_145550.jpg
    166.2 KB · Views: 17
My first biggish job near completion since lockdown started stripping out Thursday and Friday last week , this shower room needed turning round quickly so went for multi panel to blend in with the existing tile that was installed 5 years ago and still looking good , the Victoria plumb shower and tray installed hadn't faired so well was leaking badly and looked shabby , I installed a Aqualisa Zuri smart shower with the processor box installed above in the loft connected to a Viessman 100 combi and Qualitex shower tray and wetroom glass, just the wiring, commissioning, lagging , and the clearing up to do today so 4.5 days which I think is reasonable cheers chaps keep safe . Kop

Panels actually look decent. Which ones you use and how do you attach them?
 

Attachments

  • Screenshot_20200617-193412.png
    Screenshot_20200617-193412.png
    204 KB · Views: 13

Reply to What we all working on this week ? in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Newest Plumbing Threads

Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock