Discuss void meter cap off query in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Status
Not open for further replies.
U

Unregistered

Hi, I work for a housing association as a inspector. I cant find this info in the Regs or HSE, when capping a meter on a void should the engineer put any form of label on the meter to advise its temporarily capped?

thanks C :)
 
As above.

Please register with us to receive an answer to your question.
 
Status
Not open for further replies.

Reply to void meter cap off query in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Similar plumbing topics

Good afternoon all, First time posting on this site. I’m need of some opinions from Gas engineers if possible. My house is 1930s (I think). I...
Replies
1
Views
513
Good afternoon, Just looking for some general advise, I'm renovating my kitchen and need to disconnect my kitchen sink pipes while I re-plaster...
Replies
1
Views
291
Had conventional boiler and tanks removed last year and new combi fitted and just recently had it serviced but the guy who did it has given me a...
Replies
9
Views
781
Hi guys question about saniflos đź’© I'm working at a property that the entire place was fed off a sani, that's packed up, blocked the line entirely...
Replies
5
Views
564
Some advice please about a really worrying problem. I live in a terraced 2 bed room house. 10 days ago the gas combi boiler stopped heating the...
Replies
3
Views
537
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock