SoniaMarie

I'm wondering if a failed gas line test indicates a gas leak. If so, is it a requirement to upgrade gas supply line from galvanised steel to copper? Would you replace all gas pipes? What would you be looking at in terms of cost in Victoria Australia?
 
I would say yes you have a leak if it’s failed a pressure testing and depending on how it’s run might be cheaper to replace than to find the leak

@oz-plumber
 
It's not a requirement to replace the whole gas line if there is a leak.
First thing to do is try and locate the leak - if possible.
If you can, easily, then a repair could be done at that point and if the gas line holds pressure, it's OK to use the existing service

Where abouts in Vic are you located?
 

Reply to Upgrade gas supply line from galvenised steel to copper? in the UK Plumbing Forum | Plumbing Advice area at PlumbersForums.net

Similar plumbing topics

I am in process of replacing an existing sink with a new stainless steel one. The existing tap is plumbed directly to copper which means that it is earthed. The new tap will use flexible tails and so will not be earth bonded. My initial search for information suggests that there is no legal...
Replies
6
Views
273
I want to reconnect some outbuildings to an existing water supply. The supply pipe is old 22mm MDPE and buried for a fair distance so not going to dig it up and replace it 😬. Question is can I use normal 22mm plumbing push-fit connectors to make the connection as finding 22mm MDPE fittings...
Replies
1
Views
291
I was stupid enough not to check the position of the pipes under the tiles when installing a toilet and drilled right through the center of a 16 mm copper water pipe. I exposed the pipe by removing a ~30cm section of the plastic sleeve and a ~10 cm section of the pipe around the hole. Several...
Replies
0
Views
216
Copper pipes, I think its fair to say, is not what it used to be, the copper is getting thin while the cost is going up. Meanwhile, plastic Pushfit seems to be getting better and better, cost and convenience was always better, but now the quality is to, have we reached a stage where plastic will...
Replies
2
Views
280
We are from Alberta, and I own an electrical company. I have been asked by a BC Mechanical P. Eng. to install an emergency STOP button at the man-door to the boiler room. It's intent is to 'halt' the operation of the boilers in the room should there be an emergency. He is demanding that I do...
Replies
5
Views
292
Creating content since 2001. Untold Media.

Newest Plumbing Threads

Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock