G

godsell4

So this is a pre routed chipboard solution, could not find other posts on this topic.

See geniefloor

Of course the floor has little thermal mass and so has fast heat up (and cool down) times, no 7 day or more curing time waiting for a screed or poured flooring to dry.

Thoughts please? Something silly I have overlooked?
 
Status
Not open for further replies.

Reply to Thoughts on Genie Floor UFH in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Similar plumbing topics

P
  • Question
Boiler is SIRIUS THREE FS 70 Potterton commercial. Situation: We are small building contractors and my labourers managed to damage the radiator...
Replies
2
Views
143
Hi, Can anyone advise as to why the cold water to my bathroom keeps airlocking? This originally happened about 12 months ago and has happened 3-4...
Replies
9
Views
464
Hello all, I’m replacing a concrete paving slab patio in the back yard. The original patio used 50mm deep concrete slabs on hardcore & sand. I’m...
Replies
6
Views
324
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock