D
Damien1991
Hi all, new to the forum and just looking for some opinions.
I have an electric flow boiler and indirect cylinder in an unvented sytem.
I am wondering can i run the boiler T&P relief, cylinder T&P relief and ERV in the same 28mm drain pipe to outside. Using three seperate tundishes or would they require 2 or 3 seperate pipes?
Thanks in advance
I have an electric flow boiler and indirect cylinder in an unvented sytem.
I am wondering can i run the boiler T&P relief, cylinder T&P relief and ERV in the same 28mm drain pipe to outside. Using three seperate tundishes or would they require 2 or 3 seperate pipes?
Thanks in advance