Discuss My first cylinder install with boiler in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Status
Not open for further replies.
It can be piped into the control block / manifold but it needs to be in the right port eg the expansion one and not the balanced cold
 
Remember when Jay used to sweat about simple things. My my look at him now!
:) The world is your oyster m8.
Haha I know mate.. how funny!! Who’d have thought the guy who’d pooh his pants over nothing is now doing stuff like this! I wouldn’t be here without you guys, you’re my lifeline!!!!
 
Ex vessels were always piped out of the inlet control set , but as the years have gone by , tee-ing into cold feed is the done thing
 
Not bad for your first one bud few errors but overall a tidy job your gonna struggle lagging your pipework ,next time space your pipes off the wall a bit and a little further apart . cheers kop
 
Not bad for your first one bud few errors but overall a tidy job your gonna struggle lagging your pipework ,next time space your pipes off the wall a bit and a little further apart . cheers kop
What errors can you see kop? Other than the discharge which I sorted today.
 
Out of curiosity, roughly what would you guys charge (labour only) to fit a system like this.. all new heating and cold/hot water pipework throughout, 10 rads, boiler/cylinder and all controls and new gas run, about 16 meters.
 
Status
Not open for further replies.

Reply to My first cylinder install with boiler in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Newest Plumbing Threads

Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock