Hello, I've got a job where all 24 Trac Pipe connections in a meter room are unwrapped with protective tape, and i've no idea howe many rolls of tape that will get through as i've only used the stuff once. Just after a rough guide really, some pipes have had the sleeve trimmed back a bit more than others, so I guess err on the side of caution.
Thanks in advance.
Thanks in advance.