I have got to show calculations to prove the existing soil stacks on a job are capable of taking the waste we are putting into it. Can anyone point me in the right direction of how to do this, are there set values etc. Maximum pipe length for waste runs etc. I have never had to do this before, its normally all done on the drawing for us.