no nothing I just spied it. That being said, how come you didn't just weld a gas line seeing as though the LTHW is?
 
Ran out of redlead too ! External plant room, small hospital?
 
Last edited by a moderator:
Looks good SimonJohns
Are Strebel commissioning the boilers or are you doing it yourself?
 
It's a nicer job than I could do myself but the wiring to burner control and gas valve looks a bit sloppy?
 
To be honest Erm' its a complete pain in the arse wiring them up. You can use Kopex to make it look neater but ultimately it will never look brilliant. You don't get right angles in cable very often.
 
I could do wiring 100% better but would struggle to improve on pipework. Not many clips insight between the boilers?
 
To be honest Erm' its a complete pain in the arse wiring them up. You can use Kopex to make it look neater but ultimately it will never look brilliant. You don't get right angles in cable very often.

Steel conduit to within 150mm and gland on end of it then a steel flex to burner to allow maintenance .
 
no, it's a ceiling brace. it takes 1" tube and you stick it on top of the shouder so its touching ceiling then tighten it up to make it ridgid, good for big tube
 
indeed. although I only ever use a Ridgid bench to be fair, with chain and engineers vice
 
DSCF6096.jpgDSCF6106.jpgDSCF6112.jpgDSCF6754.jpgDSCF6750.jpgDSCF6757.jpga couple of pics from a recent job we have just finished. 90kw Froling boiler out and a 200kw ETA in. Previous system was totally undersized, if all the properties on the district heating system called at the same time, then only half of them got heat, The boiler was constantly running just to try and keep up, even in the summer when there was no demand for heating, and 4000litres of buffer stood cold!!!.
We replaced the boiler, rejigged the fuel store to allow us to move the buffers (new ones fitted) and then upgraded the pump set.

DSCF6096.jpg


DSCF6106.jpg


DSCF6112.jpg


DSCF6754.jpg


DSCF6750.jpg


DSCF6757.jpg
 
View attachment 19999View attachment 20001View attachment 20002View attachment 20003View attachment 20004View attachment 20005a couple of pics from a recent job we have just finished. 90kw Froling boiler out and a 200kw ETA in. Previous system was totally undersized, if all the properties on the district heating system called at the same time, then only half of them got heat, The boiler was constantly running just to try and keep up, even in the summer when there was no demand for heating, and 4000litres of buffer stood cold!!!.
We replaced the boiler, rejigged the fuel store to allow us to move the buffers (new ones fitted) and then upgraded the pump set.

How much have you come on in the past while Missplumb.
Good to see you are enjoying yourself. Neat work btw :smile:
 
Not good what a waste
Can't you recycle them
Make a bit extra then
Froling isn't cheap stuff
I agree with tamz you work is looking excellent
 
Last edited by a moderator:
tbh, it wasnt part of our contract to remove the old gear from site and we wouldnt be happy fitting a new boiler and connecting it to existing buffers etc, if they failed then it wouldnt look good for us even though it wasnt our fault.
 
it was fitted by Econergy (british Gas). it was done about 2008 so before the rhi was available. everything was undersized, boiler, pumps, expansion vessels .
 
I've got two froelings I look after. Absolute poo.

I would've gone for a Hoval STU.
 
Last edited by a moderator:
The boiler itself was fine, weve done a few 200 kw frolings and they are ok, bit too fussy, but work ok. the problem with this one was the heatloads totalled 140kw and the boiler was only a 90kw, the buffers were 2x 1600ltrs which is a bit on the short side, and because of the way they designed and controlled it, the boiler was always trying to provide heat for the system running 24 hrs a day even in the summer and the buffers sat cold.
 
just started on a new install, replace a binder biomass boiler for a froling one and completely repipe plantroom, install buffer tank in seperate building.DSCF6778.jpg20150206_161607.jpg20150207_142519.jpg20150207_160027.jpg20150207_160038.jpg20150203_130830.jpg
 
Hi missplumb,

I'm surprised you are still working in copper on these scale installs, I would have expected LCS given the cost! Any particular reason why?

We are on a baby Froling next week, all 15kw of it along with a colossal 500 litre buffer!
 
We've priced copper and lcs on a few jobs and there was only £500 in it. Then there is different cutter blades etc, and we get a decent price for whatever copper is left at the end of the job from the scrap man
the boiler we are doing is a tx250 with a 6000ltr buffer.
 
Status
Not open for further replies.

Reply to commercial pictures ? in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Similar plumbing topics

P
  • Question
Boiler is SIRIUS THREE FS 70 Potterton commercial. Situation: We are small building contractors and my labourers managed to damage the radiator...
Replies
2
Views
198
    • Like
Hi chaps I have a as new Ali plug cock key this is a big piece of kit for larger commercial fed type premises pictures available and price if your...
Replies
0
Views
599
A
Hi all I'm a limited company that's been running for 12 years and I have a lot of ongoing work, 99% commercial, and a lot of it plumbing, in...
Replies
1
Views
701
I am repiping my radiators with pex al pex, manifolds. 2 zones one 4 rads and one 2 rads. I will have the circulator pumps on the return. The...
Replies
2
Views
446
I’ve lost the pressure from the outside tap. It was working fine. I have checked the washer on the outside tap and the inside stop valve seen in...
Replies
6
Views
303
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock