Search the forum,

Discuss Checking for leaks in new pipework in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Status
Not open for further replies.
Messages
10
I'll be putting in new runs of copper for my bath / basin taps that will run under the floor and in the walls.

Will capping the ends off and turning on the water be enough to check for leaks before tiling over?
 
Yes I would leave them a couple of days before doing anything
 
You are probably fitting isolation valves for future servicing, yes? Get a bit of plastic pipe and plumb to other side and stick it in to a bucket and open it up till water comes out, close again, check. let you crack on with the rest.
 
Status
Not open for further replies.

Reply to Checking for leaks in new pipework in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Similar plumbing topics

Hi all I'm hoping someone can shine a light on this for me Since our stop tap on the pavement has now been filled with sand for whatever reason...
Replies
3
Views
313
I was stupid enough not to check the position of the pipes under the tiles when installing a toilet and drilled right through the center of a 16...
Replies
0
Views
224
Hi, basic question, any insight much appreciated. Looking to have an outdoor tap in my front porch fed from 15mm pex coming up from suspended...
Replies
6
Views
279
Hello all, I'm would like to extend an existing outside tap to another point in the garden. I'm about to pour a concrete patio and was hoping to...
Replies
6
Views
268
Hello all, I’m replacing a concrete paving slab patio in the back yard. The original patio used 50mm deep concrete slabs on hardcore & sand. I’m...
Replies
6
Views
298
Creating content since 2001. Untold Media.

Newest Plumbing Threads

Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock