Search the forum,

Discuss Can someone please help/advise what we can do next in the Bathrooms, Showers and Wetrooms area at PlumbersForums.net

Messages
3
I wondered if anyone could help. We have just had some panels installed however there is quite a large gap left at the top where the panel joins the roof to be filled. Is this normal? I was under the impression they should really go to the roof with a little silicone?
 

Attachments

  • 3DAFBA99-A518-435C-9D18-81942F0970D6.jpeg
    3DAFBA99-A518-435C-9D18-81942F0970D6.jpeg
    322.9 KB · Views: 34
Yes should be like the top one 3-4mm gap
 
I would ask multi how it invalidates the warranty as tbh that sounds a bit like a quick response
 
Sounds like the warranty isn’t worth much as sounds like they try and find a way out of it

You could get a trim to cover the cap eg like a edge / cap
 
I've just done one with a 10mm gap all around ceiling due to height of panels vs height of ceiling.
I just used a upvc trim with stix all and sealed with a white sanitary silicone.

A gaps will always be needed to get the board in, the skill is in how you finish it.
 
It is always difficult to get in and fit tightly to a slope like that - I have found the only way to get a very good finish is to template it from an off cut or thin bit of ply.
You don’t need the whole board , just the slope scribed in and referenced to a horizontal and a vertical line.
This can then be replicated at the top of your correctly sized board - it is another step and takes time but then the sort of thing the op has does not occur.
However as that is I agree with SimonG the way out of it is with a 20mm pvc trim like the window fitters use to cover the broken plaster- this scribed in neatly would look fine.
 
I've just done one with a 10mm gap all around ceiling due to height of panels vs height of ceiling.
I just used a upvc trim with stix all and sealed with a white sanitary silicone.

A gaps will always be needed to get the board in, the skill is in how you finish it.
You just use the upvc trim to gap fill or create a tidy " border" so to speak?
 
I'd imagine if it was a tight fit and expanded itself off the wall then the board manufacturer would be claiming 3mm as a minimum...?
Unless you've signed for a limited guarantee, just see how it comes out. Your plumbers liability doesn't end when he leaves site - far from it!
 

Reply to Can someone please help/advise what we can do next in the Bathrooms, Showers and Wetrooms area at PlumbersForums.net

Similar plumbing topics

Hi all I'm hoping someone can shine a light on this for me Since our stop tap on the pavement has now been filled with sand for whatever reason...
Replies
3
Views
303
We run a community village hall and have a large kitchen provided for the use of hirers. This includes a Lincat SLR9 gas cooker which I believe is...
Replies
5
Views
523
S
Hi, I seemed to have a blockage in kitchen sink. A plumber came and cleared all the pipework that is visible inside my home (there was debris and...
Replies
2
Views
124
S
Hello plumbers in my internet. So the Mrs want a spray mixer tap in the kitchen as we had two separate taps. I changed the tap for a temporary two...
Replies
2
Views
180
We are from Alberta, and I own an electrical company. I have been asked by a BC Mechanical P. Eng. to install an emergency STOP button at the...
Replies
5
Views
306
Creating content since 2001. Untold Media.

Newest Plumbing Threads

Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock