S
sspaul121
Hi all,
Once our renovations are complete we have a 4 bed bungalow, with 2 en suite shower rooms and a family bathroom.
We currently have a WB Greenstar 30CDi combi located in the middle of the bungalow.
We plan to have the Combi removed and a 250lt/300lt UV Cylinder plus System boiler installed in our Garage.
The mains pipe is being upgraded to 25mm this week in readiness for the above.
We live in Surrey, so please could anybody advise on a VERY BROAD COST to:
1. stripping out the existing Combi and pipework.
2. supply and fit UV cylinder and System Boiler;
3. install a secondary HW return?
Many Thanks,
Paul
Once our renovations are complete we have a 4 bed bungalow, with 2 en suite shower rooms and a family bathroom.
We currently have a WB Greenstar 30CDi combi located in the middle of the bungalow.
We plan to have the Combi removed and a 250lt/300lt UV Cylinder plus System boiler installed in our Garage.
The mains pipe is being upgraded to 25mm this week in readiness for the above.
We live in Surrey, so please could anybody advise on a VERY BROAD COST to:
1. stripping out the existing Combi and pipework.
2. supply and fit UV cylinder and System Boiler;
3. install a secondary HW return?
Many Thanks,
Paul