jammydodger
Gas Engineer
- Messages
- 35
had a call back today for a sevice i done. the boiler i had deemed at risk because the compartment vent low level was only 76% of required size. however the customer refused me isolation permission, so i labelled it ect blah blah. shortly after british gas had been round to fit a meter and told the lady i was wrong sayin the vent LOOKED big enough. i then had to travel back recalculate and explain, my time my money. a 14.65kw gross open flued to internal space is 280cm3 right?