- Messages
- 12,703
Been contacted but can`t do it so posting here hoping to help someone.
The job is to remove old toilet only Saniflo in a bathroom and replace it along with around 6ft of 21.5mm white waste pipe and join new pipe to existing 32/40mm solvent weld pipe. Everything including electrics is under the floor in one room and the floor is sections of 3ft square ply. Shouldn`t take more than 3hrs. He doesn`t have a regular plumber so it might lead to other work as well.
Pm me any questions or your phone number and I`ll pass your details on to the guy.
The job is to remove old toilet only Saniflo in a bathroom and replace it along with around 6ft of 21.5mm white waste pipe and join new pipe to existing 32/40mm solvent weld pipe. Everything including electrics is under the floor in one room and the floor is sections of 3ft square ply. Shouldn`t take more than 3hrs. He doesn`t have a regular plumber so it might lead to other work as well.
Pm me any questions or your phone number and I`ll pass your details on to the guy.
Last edited: