W
wtjfree
Hi all,
I am currently doing a diy project to creat a downstairs wc.
I have laid a 3m underground pipe(110mm) through the kitchen and connected to main waste pipe.
My concern is that can I drill few 40mm holes on the “leveled” waste pipe to connect sink and dishwasher etc.? Is there any other option?
Any comments would be highly appreciated
I am currently doing a diy project to creat a downstairs wc.
I have laid a 3m underground pipe(110mm) through the kitchen and connected to main waste pipe.
My concern is that can I drill few 40mm holes on the “leveled” waste pipe to connect sink and dishwasher etc.? Is there any other option?
Any comments would be highly appreciated