Search the forum,

Discuss Loo Cold Feed and Overflow Rework / Loo Refit (Part 5) in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Messages
257
This post just for interest/comment so please only read if you have time for that (Any thoughts appreciated).

Following on from previous post of making good the hole in the wall that I made for the re-plumbing:

Loo Cold Feed and Overflow Rework / Making Good the Wall (Part 4)

. . . This post details final refit of the Loo, completed just before Easter.

AllDone.JPG


From memory (as an amateur) its probably the 4th time I've ever done this.

Points of note here (please re-educate me as required):
1. Work done I assume in wrong order so I've completed all the decorating before the loo re-fit (as the space is so tight)

2. Used silicon spray in the floor waste pipe to make it easy to fit the new waste elbow. Also dipped the other pan end of the waste elbow into hot water for a few mins first so easy to fit, and make sure inner and outer seals in right place.

3. Once pan pushed onto new waste, fit the pan floor screws (measure screw position first from back wall to make finding the holes easy). Don't over-tighten the floor screws (See note below about silicon round the pan)

4. I always go for a galvanised close coupling kit even though they do corrode in time (plastic ones don't look strong enough to me). I do though always put plenty of grease on the coupling kit bolts so you can get them off one fine day.

5. The assembly order I use rightly or wrongly is (working vertically downwards)
  • Syphon
  • Rubber sealing washer
  • Just a hint of silicon on the tank before inserting the syphon with the washer (despite the manufacturers comment this not required)
  • (Tank)
  • Re-used the old rubber washer under the tank as the bottom of the tank isn't completely flat, and I don't want to overtighten anything to make the coupling kit sit flat.
  • Locking nut that comes with the Syphon (don't overtighten)
Here's a photo that shows the fit of the coupling kit against the tank (so the old rubber washer is in the gap, and you can see the tank isn't completely flat):
ExtraRubberWash.JPG


6. Marked the tank and pan centrelines with a marker pen before dropping the tank onto the pan (to make it easy to get them lined up)

7. Reconnect the plumbing, and fill the tank before final tightening of the close coupling bolts (don't overtighten) and the tank wall screws

8. When happy all ok, clear silicon round the pan where it sits on the floor. This makes sure no water gets in and rots the floor around the screw holes, and perhaps as usefully gets the pan more securely fixed to the floor than just the pan screws alone.

Lastly for interest, a photo of the scrapped Yorkshire fitting (not leaking) that was originally inside the wall at the intersection of the left hand and back walls.

Yorkshire.JPG


So I guess other joints behind walls in the house may be similar.
Looks like they added extra solder - technically probably wrong, but I guess that lets you know you have the joint hot enough, when soldering in a tricky location.

I assume most of the corrosion (more behind the joint not shown in photo) comes from the flux that hasn't been wiped off after soldering, rather than the sulphur in the breeze blocks. Wiping off the flux won't be particularly easy when the pipe is right against the blockwork, also in this case at a wall intersection.

So - all done I hope, and many thanks everyone for all the help.

Cheers,

Roy.
 

Reply to Loo Cold Feed and Overflow Rework / Loo Refit (Part 5) in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Similar plumbing topics

Hello plumbers in my internet. So the Mrs want a spray mixer tap in the kitchen as we had two separate taps. I changed the tap for a temporary two hole mixer but the cold water pressure is high mains fed and the hot is low pressure immersion tank fed. I've been trying to find info on what I...
Replies
0
Views
53
Hi all I'm hoping someone can shine a light on this for me Since our stop tap on the pavement has now been filled with sand for whatever reason, we are relying on our property fitted stopcock (this is outside on our garage wall) Unfortunately turning this to the closed position only reduces...
Replies
3
Views
229
I was stupid enough not to check the position of the pipes under the tiles when installing a toilet and drilled right through the center of a 16 mm copper water pipe. I exposed the pipe by removing a ~30cm section of the plastic sleeve and a ~10 cm section of the pipe around the hole. Several...
Replies
0
Views
168
I have had a look at previous posts and think I know the answer to this but just before I make it worse could I just check what you think about this one. Granddaughter just moved house and this valve decided to leak when it was closed. When open its fine. Normally I have repacked the gland on...
Replies
7
Views
155
Hi, Can anyone advise as to why the cold water to my bathroom keeps airlocking? This originally happened about 12 months ago and has happened 3-4 times since. It’s an upstairs bathroom, fed from a tank in the attic. The tank is about 8 Meters away and feeds a bath, sink and toilet. The tank...
Replies
9
Views
301
Creating content since 2001. Untold Media.

Newest Plumbing Threads

Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock