- Messages
- 6,157
I have a job with a pre plumbed cylinder the filling loop is attached and piped in with it, my issue is I am putting the water supply supply through a Tapworks AD9 Ultra which will supply all the hot water and cold water taps and showers except for the quooker tap in the kitchen, not sure I like the idea of softened water supplying the filling loop thinking of taking a tapping off just after the stopcock ? What your opinions chaps