A
aga memnon
Hi new to forum, can any one see a problem running 15mm polyfit
Dhw &cold pipes in conduit (with>50mm separation gap)in chase in slab, then covered with 75mm insulation and ufh pipes and screed on top. Thinking is put in chase to keep cold water pipes from warming from ufh pipes. Would be easier to put in 2 metre chase than run up walls and snake about 20 metres. (to involved to explain layout that requires this). Many thanks for any replies in advance.
Dhw &cold pipes in conduit (with>50mm separation gap)in chase in slab, then covered with 75mm insulation and ufh pipes and screed on top. Thinking is put in chase to keep cold water pipes from warming from ufh pipes. Would be easier to put in 2 metre chase than run up walls and snake about 20 metres. (to involved to explain layout that requires this). Many thanks for any replies in advance.