Welcome
This is my first post,I'm GSR for few years,
Don't do much CP 12 (I'm in maintenance and call out repair mostly- employed) and if trying do jobs close to regs -I wod not make much and upset many customers as wod fail what others pass ,
Came across that experience domestic GSR ,more then one -issuing CP12 for house with cascade of 2x65kw - so installation above 70kw despite each boiler is less,
We
Or 60kw boiler but long run in large trackpipe plus u16 which is well above 0.035m3. Can this be done on domestic?
I thought NO! And CP12 it's not valid in this cases.As commercial ticket you need for installation above 70kw even individual appliances are below and can work on it on domestic ticket in different circumstances and volume over 0.035m3 and you need for tighnest commercial ticket too .
I'm in the muddle -or you do it this on domestic ticket .?
THC
This is my first post,I'm GSR for few years,
Don't do much CP 12 (I'm in maintenance and call out repair mostly- employed) and if trying do jobs close to regs -I wod not make much and upset many customers as wod fail what others pass ,
Came across that experience domestic GSR ,more then one -issuing CP12 for house with cascade of 2x65kw - so installation above 70kw despite each boiler is less,
We
Or 60kw boiler but long run in large trackpipe plus u16 which is well above 0.035m3. Can this be done on domestic?
I thought NO! And CP12 it's not valid in this cases.As commercial ticket you need for installation above 70kw even individual appliances are below and can work on it on domestic ticket in different circumstances and volume over 0.035m3 and you need for tighnest commercial ticket too .
I'm in the muddle -or you do it this on domestic ticket .?
THC